Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T99BU02954
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/08/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
10/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor working on house on north west side. Contractor needs to call in for final. | |
06/18/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor working on house, lot 2. | |
05/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor setting up to start building on lot 2. | |
04/23/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity on site at this time. Contractor needs to close out grading permit. | |
01/24/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
12/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor starting to stabilize open lots. | |
12/11/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 3 lots left. No SWPPP concerns at this time. | |
11/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
10/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor finishing last houses. | |
09/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean wash out along 3rd. Ave. Crossed sidewalk into utility strip. | |
08/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
08/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Small wash out from painters. | |
07/20/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
06/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
06/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
05/25/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up concrete wash out around site, also provide proper washout area for subs. Spoke to Luiz in regards to issues. | |
05/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up painters wash out bewteen lots 71 and 73. Spoke to Luiz site super in regards to issue. Luiz said he would have it cleaned up and asked me to stop back by Monday 5/15/06. | |
04/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to provide proper wash out area for masons, stucco and concrete subs. Luis site super returned my call in regards to this issue, said he would have it taken care of. | |
04/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor needs to address grading issues. | |
03/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Streets clean. No stormwater concerns at this time. | |
03/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
02/28/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean streets and install wash outs for masons. Some wash out getting into street. Contacted Luis via cell phone (1205). | |
02/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor schedule to sweep roads today. |
|
01/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stromwater issues at this time. | |
01/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Site clean. Worked on final punch list. | |
12/22/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. Contractor sweeping streets. |
|
12/08/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No signs of additional run off. | |
11/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
11/03/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor given copy of Stormwater Ordinance. Contractor needs to clean streets. Talked to Luis site super. He informed me that the streets are sweep every Friday. | |
10/20/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to watch track-out and clean streets when needed. | |
10/06/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to to clean silt off Codd St. Talked to Luis in regards to silt in the street. Luis said he has the roads sweep every Friday. |
|
08/25/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installing stormwater controls. | |
08/04/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Talked to Luis the site super in regards to 1- Installing hay bales on the eastside of the project as called out on the SWPPP. (3 locations) 2- Installing stromwater control for the lots along 3rd Ave. 3- Make adjustments to the catch basins (2) on the northside of the project. Luis said he would get everything installed and call for a re-inspection. |
|
12/10/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS |