Permit: T99BU02954


Addresses:

401 S 3RD AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T99BU02954

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/08/2008 STORMWATER FOLLOW-UP INSP Approved
10/17/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor working on house on north west side. Contractor needs to call in for final.
06/18/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor working on house, lot 2.
05/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor setting up to start building on lot 2.
04/23/2007 STORMWATER FOLLOW-UP INSP Partial Approval No activity on site at this time. Contractor needs to close out grading permit.
01/24/2007 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
12/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor starting to stabilize open lots.
12/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval 3 lots left. No SWPPP concerns at this time.
11/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
10/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor finishing last houses.
09/27/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean wash out along 3rd. Ave. Crossed sidewalk into utility strip.
08/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
08/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval Small wash out from painters.
07/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
06/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
06/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
05/25/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean up concrete wash out around site, also provide proper washout area for subs. Spoke to Luiz in regards to issues.
05/11/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean up painters wash out bewteen lots 71 and 73. Spoke to Luiz site super in regards to issue. Luiz said he would have it cleaned up and asked me to stop back by Monday 5/15/06.
04/27/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to provide proper wash out area for masons, stucco and concrete subs. Luis site super returned my call in regards to this issue, said he would have it taken care of.
04/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Contractor needs to address grading issues.
03/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval Streets clean. No stormwater concerns at this time.
03/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to clean streets and install wash outs for masons. Some wash out getting into street. Contacted Luis via cell phone (1205).
02/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
Contractor schedule to sweep roads today.
01/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stromwater issues at this time.
01/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval Site clean. Worked on final punch list.
12/22/2005 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
Contractor sweeping streets.
12/08/2005 STORMWATER FOLLOW-UP INSP Partial Approval No signs of additional run off.
11/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
11/03/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor given copy of Stormwater Ordinance. Contractor needs to clean streets. Talked to Luis site super. He informed me that the streets are sweep every Friday.
10/20/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to watch track-out and clean streets when needed.
10/06/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to to clean silt off Codd St.
Talked to Luis in regards to silt in the street. Luis said he has the roads sweep every Friday.
08/25/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installing stormwater controls.
08/04/2005 STORMWATER FOLLOW-UP INSP Correction Required Talked to Luis the site super in regards to
1- Installing hay bales on the eastside of the project as called out on the SWPPP. (3 locations)
2- Installing stromwater control for the lots along 3rd Ave.
3- Make adjustments to the catch basins (2) on the northside of the project.
Luis said he would get everything installed and call for a re-inspection.
12/10/2004 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS