Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
5902 E PIMA ST
Address NEW:
5902 E PIMA ST
Apply Date:
10/03/2022
Applicant:
Description:
TI: MEDICAL OFFICE

Permit Reviews

Permit Number - T22CM07565
Permit Status: Complete
Permit Description: TI: MEDICAL OFFICE
Start Date Submittal Complete Date Status  
10/03/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/18/2022 ACTIVE Review Details
03/01/2023 COMMERCIAL REVIEW - FULL v.3 03/16/2023 APPROVED Review Details
12/19/2022 COMMERCIAL REVIEW - FULL v.2 02/17/2023 REQUIRES RESUBMIT Review Details
01/09/2024 COMMERCIAL REVIEW - FULL v.1 01/26/2024 REQUIRES RESUBMIT Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 11/28/2022 REQUIRES RESUBMIT Review Details
08/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/08/2024 APPROVED Review Details
06/13/2023 COMMERCIAL REVIEW - FULL v.1 06/13/2023 REQUIRES RESUBMIT Review Details
08/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/05/2024 APPROVED Review Details
02/27/2024 RESTAMP - COMMERCIAL v.1 03/04/2024 APPROVED Review Details
01/29/2024 COMMERCIAL REVIEW - FULL v.2 02/27/2024 APPROVED Review Details
06/14/2023 COMMERCIAL REVIEW - FULL v.2 06/15/2023 APPROVED Review Details

Conditions

Permit Number - T22CM07565
Permit Status: Complete
Permit Description: TI: MEDICAL OFFICE
Date Description Comments
06/18/2024 AIR BALANCING REPORT IS REQUIRED.
10/03/2022 GENERAL CONTRACTOR LETTER (GCL) REQUIRED PRIOR TO ISSUANCE
06/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/18/2024 WATER STERILIZATION REPORT IS REQUIRED.
06/18/2024 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07565
Permite Description: TI: MEDICAL OFFICE
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/21/2023 COT - HCBU - Preslab N/A Canceled
10/20/2023 COT - HCME - Mechanical Intermediate N/A Not Applicable
11/20/2023 COT - HCBU - Building Above Ceiling N/A Re-inspection required 11/20/23: complete the grid in the lobby, open elect boxes, holes in duct & missing straps, install registers, support flex duct off grid, move grid wires away from Fire Damper doors.
NOTE: the lobby ceiling is required to be finished per approved plans before a TCO is issued.
06/21/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass 6-21-23: Walls except electrical room.
12/22/2023 BULD - Electrical Clearance N/A Not Applicable Existing electric meter on shell building. No electrical clearance required.
08/13/2024 COT - FCON - Fire - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07565
Permit Description: TI: MEDICAL OFFICE
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/15/2023 COT - HCPL - Rough Soil Passed
06/23/2023 COT - HCPL - Plumbing Intermediate Passed
11/20/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
11/30/2023 COT - HCBU - Building Progress Passed Recommend Level Two TCO.
11/30/2023 COT - HCEL - Electrical Above Ceiling Passed
11/30/2023 COT - HCME - Mechanical Above Ceiling Passed
11/30/2023 COT - HCPL - Plumbing Progress Passed
12/01/2023 COT - BULD - SWG Clearance Passed
12/04/2023 COT - HCPL - Gas Pressure Test Passed
12/13/2023 COT - HCBU - Building Above Ceiling Passed
12/22/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/22/2023 COT - HCME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue a Level 4 Certificate of Occupancy.
12/22/2023 COT - HCEL - Electrical Intermediate Passed 12/22/23: Fire Department has approved finals. ADA requirements are completed in restroom. Outlet has been removed under mop sink.
12/22/2023 COT - HCBU - Framing Passed 12/22/23: Fire Department has approved finals. ADA requirements are completed in restroom. Outlet has been removed under mop sink.
12/22/2023 COT - HCPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue a Level 4 Certificate of Occupancy.
12/22/2023 COT - HCEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue a Level 4 Certificate of Occupancy.
12/22/2023 COT - HCBU - Interior Shear Bracing Passed 12-22-23: Plans don't show interior shear walls. Not required for inspection.
12/22/2023 COT - HCBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Okay to issue a Level 4 Certificate of Occupancy.
12/22/2023 COT - HCEL - Electrical Progress Passed
12/22/2023 COT - HCPL - Gas Final Passed
06/14/2024 ENGR Engineering Final Passed
06/14/2024 COT - HCME - Mechanical Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
OPTIMA MEDICAL - LAB RESULTS-2024-07-31_V1.PDF DOCUMENTS VIEW
OPTIMAMEDICAL TUCSON AIR BALANCING REPORT_V1.PDF DOCUMENTS VIEW
CONS-OPTIMA ADA PARKING_RV1_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER_ADA PARKING._RV1_V1.PDF DOCUMENTS VIEW
NARRATIVE LETTER_06-14-23_V1.PDF DOCUMENTS VIEW
CONS-23-06-07_OPTIMA MEDICAL_TUCSON_REVISION 4_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2022-02-20_OPTIMA MEDIAL TUCSON_ISSUE FOR PERMIT REVISION 2_V3.PDF DOCUMENTS VIEW
RESPONSE LETTER_ISSUE FOR PERMIT REVISON 2_V2.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW