Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Building Above Ceiling
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2023 | COT - HCBU - Building Above Ceiling | Re-inspection required | 11/20/23: complete the grid in the lobby, open elect boxes, holes in duct & missing straps, install registers, support flex duct off grid, move grid wires away from Fire Damper doors. NOTE: the lobby ceiling is required to be finished per approved plans before a TCO is issued. |
|
| 12/13/2023 | COT - HCBU - Building Above Ceiling | Passed |