Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2009 W SAN JUAN TR
Apply Date:
08/17/2022
Applicant:
Gilbert Catalan
Description:
R-Bathroom Addition

Permit Reviews

Permit Number - T22CM06299
Permit Status: Complete
Permit Description: R-Bathroom Addition
Start Date Submittal Complete Date Status  
08/17/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 09/12/2022 COMPLETED Review Details
01/23/2024 RESIDENTIAL NEW DWELLING v.2 02/06/2024 APPROVED Review Details
10/30/2023 RESIDENTIAL NEW DWELLING v.1 10/30/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM06299
Permit Status: Complete
Permit Description: R-Bathroom Addition
Date Description Comments
02/06/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
02/06/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06299
Permite Description: R-Bathroom Addition
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/22/2024 COT - RSBU - Masonry Pregrout N/A Partial Pass
04/12/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass 4/12/24: CMU footers for stem wall per plan ok to proceed.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06299
Permit Description: R-Bathroom Addition
Total Completed Inspections - 12
Date Description Inspector Results Comments
04/23/2024 COT - RSBU - Masonry Pregrout Passed
04/23/2024 COT - RSBU - Stem Wall/Retaining Wall Passed
04/23/2024 COT - RSPL - Rough Soil Passed
04/24/2024 COT - RSBU - Preslab Passed
05/09/2024 COT - RSBU - Roof Nailing Passed Ok to,dry in roof system.
05/09/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to cover exterior walls.
05/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/22/24: ground/bond bushing required at raceway at (main panel and sub panel), grounds and neutrals need to be separate at sub-panel, seal all penetrations through vapor barrier, seal all penetrations through top plate, fire blocking required along perimeter of addition at top plate, copper piping outside of thermal envelope must be insulated, copper in contact with stucco must be wrapped for protection against corrosion,

5/28/24: corrections made ok to proceed.
08/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/07/2024 COT - RSME - Mechanical Final Passed
08/07/2024 COT - RSPL - Plumbing Final Passed
08/12/2024 RSBU - Building Final Passed 8/12/2024 corrections were made.
08/12/2024 COT - RSEL - Electrical Final Passed 8/12/2024 corrections were made.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CORRECTED OBA_V1.PDF DOCUMENTS VIEW
BATHROOM ADDITON REVISON PLANS_V1.PDF DOCUMENTS VIEW