Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5/22/24: ground/bond bushing required at raceway at (main panel and sub panel), grounds and neutrals need to be separate at sub-panel, seal all penetrations through vapor barrier, seal all penetrations through top plate, fire blocking required along perimeter of addition at top plate, copper piping outside of thermal envelope must be insulated, copper in contact with stucco must be wrapped for protection against corrosion, | |
| 05/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/22/24: ground/bond bushing required at raceway at (main panel and sub panel), grounds and neutrals need to be separate at sub-panel, seal all penetrations through vapor barrier, seal all penetrations through top plate, fire blocking required along perimeter of addition at top plate, copper piping outside of thermal envelope must be insulated, copper in contact with stucco must be wrapped for protection against corrosion, 5/28/24: corrections made ok to proceed. |