Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
07/28/2022
Applicant:
Jonathan Renfroe
Description:
Construction of New Tractor Supply Store

Permit Reviews

Permit Number - T22CM05743
Permit Status: Complete
Permit Description: Construction of New Tractor Supply Store
Start Date Submittal Complete Date Status  
07/28/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/31/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL 10/18/2022 ACTIVE Review Details
11/28/2023 COMMERCIAL REVIEW - FULL v.3 12/21/2023 REQUIRES RESUBMIT Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 11/10/2022 REQUIRES RESUBMIT Review Details
11/24/2023 COMMERCIAL REVIEW - FULL v.2 11/24/2023 REQUIRES RESUBMIT Review Details
01/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2024 APPROVED Review Details
11/23/2022 COMMERCIAL REVIEW - FULL v.2 01/26/2023 APPROVED Review Details
01/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/12/2024 APPROVED Review Details
07/25/2023 COMMERCIAL REVIEW - FULL v.1 07/28/2023 APPROVED Review Details
11/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/14/2023 APPROVED Review Details
11/22/2023 COMMERCIAL REVIEW - FULL v.1 11/22/2023 REQUIRES RESUBMIT Review Details
08/24/2023 COMMERCIAL REVIEW - FULL v.1 09/06/2023 APPROVED Review Details
03/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/29/2023 REQUIRES RESUBMIT Review Details
04/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/24/2023 APPROVED Review Details

Conditions

Permit Number - T22CM05743
Permit Status: Complete
Permit Description: Construction of New Tractor Supply Store
Date Description Comments
11/09/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/09/2022 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/26/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
11/09/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/09/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
11/09/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/09/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
11/09/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/09/2022 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
11/09/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05743
Permite Description: Construction of New Tractor Supply Store
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
05/31/2023 COT - HCPL - Plumbing Progress N/A Not Applicable 5/31/23: James called to cancel sewer inspection, Pima County has jurisdiction.
07/19/2023 COT - HCEL - Electrical Underground N/A Re-inspection required
09/25/2023 COT - HCEL - Electrical Progress N/A Not Applicable 9/25/23: COT does not inspect the pad or foundations that will support transformers.
09/18/2023 COT - HCBU - Building Above Ceiling N/A Re-inspection required 9/18/23: ceiling grid required to be installed for above ceiling inspection. The grid ceiling and ALL trades are inspected at one time.
09/06/2023 COT - HCBU - Building Progress N/A Partial Pass 6-16-23: Pre-slab inside.
8/23/23: 145 L/F sidewalk on west side of building.

Outdoor display area.

9/6/23: sidewalk at northwest area of building .
10/03/2023 COT - HCEL - Electrical Above Ceiling N/A Not Ready
07/06/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 7-6-23: FOD area.
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Alarm - Final N/A Not Ready
12/15/2023 ENGR Engineering Final N/A Partial Pass This site is approved for level 4 Occupancy for TCO at this time
12/14/2023 COT - FCON - Fire - Final N/A Partial Pass Need operational permit for propane tank.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05743
Permit Description: Construction of New Tractor Supply Store
Total Completed Inspections - 33
Date Description Inspector Results Comments
08/08/2023 COT - HCPL - Backwater Valve Passed 8/8/23: tested at 85 psi hydro
08/09/2023 COT - HCEL - Electrical Intermediate Passed 8/9/23: all rooms.
08/09/2023 COT - HCPL - Plumbing Intermediate Passed
09/13/2023 COT - HCEL - Electrical Underground Passed
10/10/2023 COT - HCBU - Building Above Ceiling Passed
10/12/2023 COT - HCPL - Gas Final Passed
11/02/2023 COT - HCME - Mechanical Progress Passed
11/15/2023 COT - HCBU - Roof Nailing Passed
11/15/2023 COT - HCBU - Framing Passed
11/15/2023 COT - HCBU - Interior Shear Bracing Passed
11/15/2023 COT - HCPL - Gas Pressure Test Passed
11/15/2023 COT - HCPL - Plumbing Above Ceiling Passed
11/15/2023 COT - HCPL - Sewer Passed
11/15/2023 COT - HCME - Mechanical Intermediate Passed
11/15/2023 COT - HCME - Mechanical Above Ceiling Passed
11/15/2023 COT - HCBU - Stem Wall/Retaining Wall Passed
11/15/2023 COT - HCBU - Masonry Pregrout Passed
11/15/2023 COT - HCPL - Rough Soil Passed
11/15/2023 COT - HCBU - Building Progress Passed
11/15/2023 COT - HCEL - Electrical Above Ceiling Passed
12/13/2023 COT - HCME - Mechanical Final Passed 12-13-23: Okay for a TCO Level 4. Project is complete, with mechanical, electrical, and plumbing fixtures installed and operational.
12/13/2023 COT - HCBU - Building Final Passed 12-13-23: Okay for a TCO Level 4. Project is complete, with mechanical, electrical, and plumbing fixtures installed and operational.
12/13/2023 COT - HCBU - Excavation/Rebar/Zoning Passed 12-13-23: All footing are completed.
12/13/2023 COT - HCEL - Outdoor Lighting Passed Passed parking lot lights are installed and operational. Building lights are installed and operational.
12/13/2023 COT - HCBU - Preslab Passed All concrete slabs have been approved and poured.
12/13/2023 COT - HCPL - Plumbing Final Passed 12-13-23: Okay for a TCO Level 4. Project is complete, with mechanical, electrical, and plumbing fixtures installed and operational.
12/13/2023 COT - HCEL - Electrical Final Passed 12-13-23: Okay for a TCO Level 4. Project is complete, with mechanical, electrical, and plumbing fixtures installed and operational.
12/13/2023 COT - FCON - Sprinkler - Final Passed
12/14/2023 COT - FCON - Alarm - Final Passed
12/13/2023 COT - BULD - SWG Clearance Passed Passed on 11-8-23 by Thomas Lundberg. SWG has installed meter and turned gas on to building.
12/13/2023 BULD - Electrical Clearance Passed Passed by Thomas Lundberg on 11-3-23. TEP has installed meters and powered up building.
01/11/2024 ENGR Engineering Final Passed
01/30/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
TSC TUCSON SE-CFS TRUSS DESIGN_V1.PDF DOCUMENTS VIEW
TSC TUCSON SE TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
TRACTOR SUPPLY WATER TEST LETTER 10-5-2023-2023-11-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - SPECIAL INSPECTION CERTIFICATE 2-23-23-2023-03-07_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - REVISED UTILITY PLAN - V13_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - E4.0 SHEET REVISIONS - NARRATIVE_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - E4.0 SHEET (REVISED) - V5_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-1_UTILITY PLAN_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
3_BUILDING_PERMIT_REVIEW _ROUND 2_RESPONSE_LETTER_V1.PDF DOCUMENTS VIEW
2 COMMENT LETTER_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS DATASHEET_V1.PDF DOCUMENTS VIEW
1_PHOTOMETRIC_V1.PDF DOCUMENTS VIEW
1_HVAC LOADS_V1.PDF DOCUMENTS VIEW
1_GREENHOUSE_V1.PDF DOCUMENTS VIEW
1_GEOTECH REPORT_V1.PDF DOCUMENTS VIEW
1_ELECTRICAL LOAD SUMMARY_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
3_BUILDING_PERMIT_REVIEW _ROUND 2_RESPONSE_LETTER_V1.PDF DOCUMENTS VIEW
2 COMMENT LETTER_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS DATASHEET_V1.PDF DOCUMENTS VIEW
1_PHOTOMETRIC_V1.PDF DOCUMENTS VIEW
1_HVAC LOADS_V1.PDF DOCUMENTS VIEW
1_GREENHOUSE_V1.PDF DOCUMENTS VIEW
1_GEOTECH REPORT_V1.PDF DOCUMENTS VIEW
1_ELECTRICAL LOAD SUMMARY_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - ES1.0 SHEET REVISIONS - NARRATIVE_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - ES1.0 SHEET (REVISED) - V5_V1.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - SPECIAL INSPECTION CERTIFICATE (V2)_V1.PDF.PDF DOCUMENTS VIEW
TSC TUCSON, AZ (SE) - SPECIAL INSPECTION CERTIFICATE (V2)_V1.PDF DOCUMENTS VIEW
PDSD PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_CONSTRUCTION_PLAN_SET_V4_V1.PDF DOCUMENTS VIEW
1_CHECKLIST_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW