Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
Permit Number - T22CM05743
Inspection Description - COT - HCBU - Excavation/Rebar/Zoning
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2023 | COT - HCBU - Excavation/Rebar/Zoning | Not Ready | This inspection was called without contractor verifying work was ready. | |
02/27/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 8 interior footings are approved to pour | |
03/01/2023 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor texted to say cancel the inspection today, not ready | |
03/02/2023 | COT - HCBU - Excavation/Rebar/Zoning | Canceled | Contractor texted to say cancel the inspection today, not ready. March 2nd: Joe called to cancel due to weather conditions. |
|
03/06/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Contractor texted to say cancel the inspection today, not ready. March 2nd: Joe called to cancel due to weather conditions. March 6th: Partial for entire perimeter footing |
|
05/09/2023 | COT - HCBU - Excavation/Rebar/Zoning | Re-inspection required | 5/9/23: storage shed footing reinforcing not per schedule. | |
05/17/2023 | COT - HCBU - Excavation/Rebar/Zoning | Re-inspection required | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building |
|
05/18/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building 5/18/23: 6 footings for Forage Shed approved to pour |
|
05/24/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building 5/18/23: 6 footings for Forage Shed approved to pour 5/24/23: 20 pier footing for green house on east side of building approved to pour. |
|
06/09/2023 | COT - HCBU - Excavation/Rebar/Zoning | Re-inspection required | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building 5/18/23: 6 footings for Forage Shed approved to pour 5/24/23: 20 pier footing for green house on east side of building approved to pour. 6/9/23: 7 light pole bases not ready for inspection. Install 3 spacer wheels at mid-point of hole, maintain min 3" clearance of earth to reinforcing on all sides, install UFER ground. |
|
06/13/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building 5/18/23: 6 footings for Forage Shed approved to pour 5/24/23: 20 pier footing for green house on east side of building approved to pour. 6/9/23: 7 light pole bases not ready for inspection. Install 3 spacer wheels at mid-point of hole, maintain min 3" clearance of earth to reinforcing on all sides, install UFER ground. 6/13/23: 7 light pole bases are approved to pour. |
|
06/16/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 6-16-23: Pre-slab inside. | |
07/06/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 7-6-23: FOD area. | |
08/08/2023 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | 5/9/23: storage shed footing reinforcing not per schedule. 5/17/23: reinforcing for 6 large footings at storage shed not in place. Approved plans not on site for round column footings at east side of main building 5/18/23: 6 footings for Forage Shed approved to pour 5/24/23: 20 pier footing for green house on east side of building approved to pour. 6/9/23: 7 light pole bases not ready for inspection. Install 3 spacer wheels at mid-point of hole, maintain min 3" clearance of earth to reinforcing on all sides, install UFER ground. 6/13/23: 7 light pole bases are approved to pour. 6-16-23: Pre-slab inside. 7-6-23: FOD area. 8/8/23: pad on south side of building OK to pour. |
|
11/15/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
12/13/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | 12-13-23: All footing are completed. |