Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/11/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 11/09/2023 |
ENGR Engineering Final
|
|
Partial Pass |
OK FOR A LEVEL 2 TCO FOR STOCKING AND TRAINING |
| 12/13/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to finish all the landscaping around the whole area and the parking lot trees need to be planted. DG needs to be placed. HYDROSEEDING needs to be placed in the grade on the west side needs to be re-cut. |
| 12/15/2023 |
ENGR Engineering Final
|
|
Partial Pass |
This site is approved for level 4 Occupancy for TCO at this time |