Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1952 W KING AV
Address NEW:
1952 W KING AV
Apply Date:
07/28/2022
Applicant:
Description:
SFR

Permit Reviews

Permit Number - T22CM05735
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
07/28/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/26/2022 COMPLETED Review Details
01/04/2023 RESIDENTIAL NEW DWELLING v.1 01/12/2023 REQUIRES RESUBMIT Review Details
10/30/2024 RESIDENTIAL NEW DWELLING v.1 10/30/2024 REQUIRES RESUBMIT Review Details
11/04/2024 RESIDENTIAL NEW DWELLING v.2 11/25/2024 REQUIRES RESUBMIT Review Details
02/15/2024 RESIDENTIAL NEW DWELLING v.4 03/18/2024 APPROVED Review Details
01/26/2024 RESIDENTIAL NEW DWELLING v.3 01/26/2024 REQUIRES RESUBMIT Review Details
12/26/2023 RESIDENTIAL NEW DWELLING v.2 01/08/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM05735
Permit Status: Complete
Permit Description: SFR
Date Description Comments
03/18/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
03/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05735
Permite Description: SFR
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
05/17/2024 RSBU - Building Final N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
4/26/24: per previous notes
5/17/24: called Mark at 9:25am (no answer and left message), arrived onsite at 9:40 (called again, no answer), no access to site.
04/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSEL - Electrical Final N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSEL - Electrical Underground N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSEL - Grounding/Bonding N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSME - Mechanical Final N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSPL - Yard Water Line N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
04/12/2024 COT - RSPL - Rough Soil N/A Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05735
Permit Description: SFR
Total Completed Inspections - 13
Date Description Inspector Results Comments
05/17/2024 RSBU - Building Final Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSBU - Preslab Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSBU - Roof Nailing Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSEL - Electrical Final Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSEL - Electrical Underground Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSEL - Grounding/Bonding Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSME - Mechanical Final Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSPL - Yard Water Line Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSPL - Plumbing Final Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.
05/17/2024 COT - RSPL - Rough Soil Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OBA_V1.PDF DOCUMENTS VIEW
CONS-2024 PARRA RESIDENCE PLANS_V2.PDF DOCUMENTS VIEW
DDO_24_01_DECISION.PDF SPECIAL APPLICATIONS VIEW
DDO_24_01_APPLICATION.PDF DOCUMENTS VIEW
DDO_24_01_NOTICE.PDF DOCUMENTS VIEW
DDO_24_01_PLAN SET.PDF DOCUMENTS VIEW