Permit: T22CM05735

Parcel: 11806105B


Addresses:

1952 W KING AV

Inspection Status: Re-inspection required

Inspection History: COT - RSPL - Rough Soil 

Date Description Inspector Results Comments
04/12/2024 COT - RSPL - Rough Soil  Re-inspection required 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
05/17/2024 COT - RSPL - Rough Soil  Passed 4/12/24: Two circuits missing at kitchen, receptacles at exterior need to be WR, missing weather cover at exterior receptacles, bank plate missing at main panel, properly label all panels, properly secure exterior conduit to house, hose bib needs to be properly insulated and UV coated, T&P needs to be installed at Water heater, all exterior pipes need to be coated for UV protection, Bathtub pump needs to be grounded, GFCI at bathtub not working properly, HVAC is being over Amped (30 max), (Mechanical, Plumbing, Electrical, framing, contractor)Letters will be required prior to final stating that all work done meets or exceeds the requirements of the 2018 IRC. More items may be added.
5/17/24: Contractor letter provided stating that all work preformed meets or exceeds the requirements of the 2018 IRC. All code violations called out at previous inspections have been addressed and corrected. Certificate of Occupancy will be granted with the following conditions: Homeowner will revise and submit future expansion of Home to the City of Tucson within 6 months.