Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
07/14/2022
Applicant:
Daria Hopkins
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - T22CM05355
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
07/14/2022 OTHER 08/08/2022 COMPLETED Review Details
03/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/15/2024 APPROVED Review Details
02/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM05355
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
07/14/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/14/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/14/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/13/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/21/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05355
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
04/11/2023 COT - RSPL - Sewer N/A Not Ready not ready
04/12/2023 COT - RSPL - Rough Soil N/A Not Ready Not ready. Rocky soils remove all culichi. Stacks are to be filled to top. 4/12/2023
04/12/2023 COT - RSPL - Yard Water Line N/A Not Ready
06/05/2023 COT - LCPL - Plumbing Intermediate N/A Not Ready 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking.
Inspection stopped; walk for check compliance/ completeness before rescheduling.
06/05/2023 COT - RSPL - Gas Pressure Test N/A Not Ready 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking.
Inspection stopped; walk for check compliance/ completeness before rescheduling.
06/05/2023 COT - LCBU - Framing N/A Not Ready 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking.
Inspection stopped; walk for check compliance/ completeness before rescheduling.
06/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking.
Inspection stopped; walk for check compliance/ completeness before rescheduling.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05355
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 23
Date Description Inspector Results Comments
04/13/2023 COT - RSPL - Rough Soil Passed
04/13/2023 COT - RSPL - Yard Water Line Passed
04/26/2023 COT - RSBU - Preslab Passed Post tension cables are in place with chairs holding them up above ground. Shear bracing is installed with rebar reinforcement. Ufer ground is in place. Okay to pour concrete.
04/26/2023 COT - RSEL - Electrical Underground Passed Underground electrical for kitchen island installed.
04/26/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground in place.
04/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Post tension cables are in place with chairs holding them up above ground. Shear bracing is installed with rebar reinforcement. Ufer ground is in place.
05/05/2023 COT - RSBU - Roof Nailing Passed
05/10/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/05/2023 COT - RSEL - Construction Power Passed
06/21/2023 COT - LCPL - Plumbing Intermediate Passed
06/21/2023 COT - RSPL - Gas Pressure Test Passed
06/21/2023 COT - LCBU - Framing Passed
06/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/05/2023 COT - HCBU - Interior Shear Bracing Passed
08/25/2023 BULD - Electrical Clearance Passed resent clearance that was approved on 6/5/2023
09/06/2023 COT - BULD - SWG Clearance Passed
09/06/2023 COT - RSPL - Plumbing Final Passed
09/12/2023 COT - RSME - Mechanical Final Passed
09/12/2023 ENGR Engineering Final Passed
09/12/2023 RSBU - Building Final Passed
09/12/2023 RSME - Mechanical Progress Passed
09/12/2023 COT - RSEL - Outdoor Lighting Passed
09/12/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
P21WP00060 FINAL ACCEPTANCE PARCEL 3 - MERITAGE_V1.PDF DOCUMENTS VIEW
T22CM05355 3.5.24_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW