Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCBU - Framing | Not Ready | ||
| 06/05/2023 | COT - LCBU - Framing | Not Ready | 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking. Inspection stopped; walk for check compliance/ completeness before rescheduling. |
|
| 06/15/2023 | COT - LCBU - Framing | Re-inspection required | ||
| 06/21/2023 | COT - LCBU - Framing | Passed |