Inspection Status: Not Ready
Inspection History: COT - RSPL - Gas Pressure Test
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Gas Pressure Test | Not Ready | ||
| 06/05/2023 | COT - RSPL - Gas Pressure Test | Not Ready | 6-5-23: 1-Complete powder room electrical/ Mechanical/Plumbing. 2-Complete fire blocking at dead space upstairs. 3- Seal all fire locking. Inspection stopped; walk for check compliance/ completeness before rescheduling. |
|
| 06/15/2023 | COT - RSPL - Gas Pressure Test | Re-inspection required | 6-15-23: 1- Exhaust fan is buried in framing at powder room. 2-Nail plate missing at sprinkler line by stairs. 3- Seal fire block at sprinkler line above stairs. 4- Fire block front pop out at top and 10' horizontally per code. 5-Nail plate stack at second floor closet. | |
| 06/21/2023 | COT - RSPL - Gas Pressure Test | Passed |