Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3350 E MEDINA RD
Address NEW:
3350 E MEDINA RD
Apply Date:
07/05/2022
Applicant:
Jennifer Kimura
Description:
TI: Imperial Brown Warehouse

Permit Reviews

Permit Number - T22CM05063
Permit Status: Complete
Permit Description: TI: Imperial Brown Warehouse
Start Date Submittal Complete Date Status  
07/05/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 09/06/2022 COMPLETED Review Details
09/22/2022 RESUBMITTAL 10/12/2022 COMPLETED Review Details
11/10/2022 COMMERCIAL REVIEW - FULL v.1 12/15/2022 APPROVED Review Details
04/13/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/20/2023 APPROVED Review Details
01/27/2023 COMMERCIAL REVIEW - FULL v.1 01/27/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM05063
Permit Status: Complete
Permit Description: TI: Imperial Brown Warehouse
Date Description Comments
10/07/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/07/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/07/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
12/15/2022 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05063
Permite Description: TI: Imperial Brown Warehouse
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/10/2023 COT - FCON - Sprinkler - Final N/A Partial Pass They are adding a big cooler and a compressor room which will have a sprinkler head dropped inside them. The final will be given at that time.
COT - FCON - Alarm - Final N/A Canceled
04/14/2023 COT - BULD - SWG Clearance N/A Not Applicable No gas service to this site.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05063
Permit Description: TI: Imperial Brown Warehouse
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/22/2023 BULD - Electrical Clearance Passed clearance for TEP ECO.
Meter #512
04/14/2023 COT - LCBU - Building Final Passed
04/24/2023 COT - FCON - Fire - Final Passed
04/24/2023 FCON – Fire – Intermediate Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL SPECIAL INSPECTION CERTIFICATE-2023-04-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
00 RACK CALCS 1_V1.PDF DOCUMENTS VIEW
00 RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
00 TI NARRATIVE OF CHANGES_V1.PDF DOCUMENTS VIEW
01 IMPERIAL BROWN TI EQUIP ANCH STRUC CALCULATIONS 9-13-22_V1.PDF DOCUMENTS VIEW
01 RACK CALCS 2_V1.PDF DOCUMENTS VIEW
01 RACK PLANS 2_V1.PDF DOCUMENTS VIEW
02 IB OPERATIONS NARRATIVE_V1.PDF DOCUMENTS VIEW
03 IB HMIS_V1.PDF DOCUMENTS VIEW
04 IB HMMP ENVIRONMENTAL MGMT SYSTEM_V1.PDF DOCUMENTS VIEW
05 IB HMMP HAZARDOUS MAT MGMT SYSTEM_V1.PDF DOCUMENTS VIEW
06 IB HMMP MATERIAL PLAN BLDG MSDS_V1.PDF DOCUMENTS VIEW
07 IB TRANSFER PROCEDURE 1 ISO_V1.PDF DOCUMENTS VIEW
08 IB TRANSFER PROCEDURE 2 RESIN_V1.PDF DOCUMENTS VIEW
09 DUST COMPLIANCE LETTER_V1.PDF DOCUMENTS VIEW
10 IB DUST HAZARD ANALYSIS REPORT_V1.PDF DOCUMENTS VIEW
CONS-00 RACK PLANS 1_V1.PDF DOCUMENTS VIEW
IB WAREHOUSE TI REVISED PLANS 2_V1.PDF DOCUMENTS VIEW