Permit Number: T22CM05063
Parcel: 140410010

Address:
3350 E MEDINA RD

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T22CM05063
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/07/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Approv-Cond Activity Number: T22CM05063

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
N/A


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
No mechanical plans submitted. no mechanical work is indicated in their scope of work
approved/Subject to field approval

ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E1.01 ELECTRICAL DEMOLITION LIGHTING PLAN - AREA A: Comcheck implies that all of the 2x4 lighting is being removed, yet the Demo shows most of the 2x4 as (E.) (existing) which implies it is being left in place. Should correct before IFC. Comment applies to all lighting Demo sheets.


PLUMBING REVIEW COMMENTS:
Approved


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
10/12/2022 JPEELDA1 FIRE REVIEW Reqs Change You shall provide a plan set that when expanded is legible to read
You shall provide a written narrative letter of the operations in every area of the building from wood working, metal working, coating and so on.
Provide a full Hazardous Material Inventory Statement (HMIS) Per IFC 2018, Chapter 50, Section 5001.5.2
Provide a Dust Hazard analysis (DHA) per IFC 2018, Chapter 22, Section 2003
We will not accept the wood combustible dust equipment as a deferred submittal, plans shall show the equipment for dust collection meets the requirement of IFC 2018, Chapter 22, Section 2203.3 & NFPA 654, 664.
Provide MSDS and all quantities of chemicals being used throughout the buildings and define the operations in those areas.
Define and explain how the refilling of the LD Resin & LD ISO refilling process will take place in the facility.
Some Epoxy/Resins will only allow for foam and or water mist to be used in those areas for fire containment need better clarification of chemical to confirm proper extinguishment is being used.
Will drying booths and or industrial ovens be added to the process?
Provide a Hazardous Material Management plan per the IFC 2018, Chapter 50 Section 5001.5.1 (HMMP)

Questions:

Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
Tucson Fire Department