Permit: T22CM04603
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6233 S SARAH ELIZABETH DR
Address NEW:
6233 S SARAH ELIZABETH DR
Apply Date:
06/20/2022
Applicant:
Myrna jimenez
Description:
R-Enclose Porch
Permit Reviews
Permit Number - T22CM04603
Permit Status: Complete
Permit Description: R-Enclose Porch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/18/2022 | COMPLETED |
| 08/02/2022 | RESUBMITTAL | 08/17/2022 | COMPLETED |
Conditions
Permit Number - T22CM04603
Permit Status: Complete
Permit Description: R-Enclose Porch
| Date | Description | Comments |
|---|---|---|
| 08/16/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 08/17/2022 | GCL or Owner/Builder Waiver required prior to permit issuance |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04603
Permite Description: R-Enclose Porch
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2023 | COT - RSBU - Roof Nailing | N/A | Not Applicable | 8/24/23 using existing roof on plans 24 oc |
| 08/24/2023 | COT - RSBU - Preslab | N/A | Not Applicable | 8/24/23 using existing foundation |
| 08/24/2023 | COT - RSEL - Electrical Underground | N/A | Not Applicable | 8/24/23 No electrical underground |
| 08/24/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 8/24/23 needs anchor bolts secured |
| 08/24/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Applicable | 8/24/23 using existing foundation |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04603
Permit Description: R-Enclose Porch
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2023 | COT - LCBU - Framing | Passed | ||
| 08/24/2023 | COT - RSPL - Rough Soil | Passed | ||
| 09/21/2023 | COT - LCPL - Plumbing Intermediate | Passed | Denied. Provide approved plans on site. The job inside and out is not per code. Need to make major modifications. 3/13/2023 8/24/23 Need pex plumbing for water connection, shower needs weatherproof show needs individual control 9/21/23: passed |
|
| 10/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/18/2023 | COT - RSME - Mechanical Final | Passed | ||
| 10/18/2023 | RSBU - Building Final | Passed | ||
| 10/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 10/18/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/18/2023 | COT - HCBU - Interior Shear Bracing | Passed |