Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Plumbing Intermediate
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | Not Ready | ||
| 03/13/2023 | COT - LCPL - Plumbing Intermediate | Not Ready | Denied. Provide approved plans on site. The job inside and out is not per code. Need to make major modifications. 3/13/2023 | |
| 08/24/2023 | COT - LCPL - Plumbing Intermediate | Re-inspection required | 8/24/23 Need pex plumbing for water connection, shower needs weatherproof show needs individual control | |
| 09/21/2023 | COT - LCPL - Plumbing Intermediate | Passed | Denied. Provide approved plans on site. The job inside and out is not per code. Need to make major modifications. 3/13/2023 8/24/23 Need pex plumbing for water connection, shower needs weatherproof show needs individual control 9/21/23: passed |