Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
501 E MOHAVE RD
Address NEW:
501 E MOHAVE RD
Apply Date:
06/11/2022
Applicant:
Description:
(T22DV02475) Repaired and Remodel without permit

Permit Reviews

Permit Number - T22CM04348
Permit Status: Inspections complete
Permit Description: (T22DV02475) Repaired and Remodel without permit
Start Date Submittal Complete Date Status  
06/11/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/01/2022 COMPLETED Review Details
08/02/2022 RESUBMITTAL 08/08/2022 COMPLETED Review Details
01/08/2024 RESIDENTIAL NEW DWELLING v.2 02/01/2024 APPROVED Review Details
01/03/2024 RESIDENTIAL NEW DWELLING v.1 01/03/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM04348
Permit Status: Inspections complete
Permit Description: (T22DV02475) Repaired and Remodel without permit
Total Outstanding Activity Conditions - 1
Date Name
08/04/2022 FUP T22OT00540 MUST BE PAID BEFORE FINAL INSPECTIONS.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: T22CM04348
Permite Description: (T22DV02475) Repaired and Remodel without permit
Total Outstanding Inspections - 15
Last Inspection Date Description Inspector Results Comments
08/03/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 08/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
08/03/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 08/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
09/12/2023 BULD - Electrical Clearance N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
09/12/2023 COT - RSBU - Interior Shear Bracing N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
09/12/2023 COT - RSEL - Electrical Underground N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
09/12/2023 COT - RSPL - Sewer N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
11/22/2023 COT - RSPL - Plumbing Final N/A Re-inspection required (with fee) No front porch according to the plans. No ani tip hold down for stove. No hammer arrestor. Provide ladder to check the unit on the roof. Smoke detector needs to be 3’ from register. Not built according to plan. Provide arc fault breakers per plan. Provide a UFER for electrical panel. Re submit a revision on how the house is built. Ceiling fans are too low. Need to be flushed to ceiling. STOPPED INSPECTION. 11/22/2023
09/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
09/12/2023 COT - RSPL - Rough Soil N/A Re-inspection required Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023
11/22/2023 COT - RSPL - Yard Water Line N/A Re-inspection required (with fee) No front porch according to the plans. No ani tip hold down for stove. No hammer arrestor. Provide ladder to check the unit on the roof. Smoke detector needs to be 3’ from register. Not built according to plan. Provide arc fault breakers per plan. Provide a UFER for electrical panel. Re submit a revision on how the house is built. Ceiling fans are too low. Need to be flushed to ceiling. STOPPED INSPECTION. 11/22/2023
10/03/2023 COT - RSEL - Electrical Final N/A Not Ready 10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed
10/03/2023 RSBU - Building Final N/A Not Ready 10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed
10/03/2023 COT - RSME - Mechanical Final N/A Not Ready 10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed
10/03/2023 COT - RSBU - Roof Nailing N/A Not Ready 10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed
10/03/2023 COT - LCBU - Framing N/A Not Ready 10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T22CM04348
Permit Description: (T22DV02475) Repaired and Remodel without permit
Total Completed Inspections - 17
Date Description Inspector Results Comments
09/12/2023 COT - BULD - SWG Clearance Passed N/A. 9/12/2023
09/12/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed N/A. 9/12/2023 home is existing structure.
09/12/2023 COT - RSBU - Preslab Passed N/A. 9/12/2023 home is existing structure.
09/12/2023 COT - RSPL - Gas Pressure Test Passed N/A. 9/12/2023
02/20/2024 BULD - Electrical Clearance Passed
02/20/2024 COT - RSBU - Interior Shear Bracing Passed
02/20/2024 COT - RSEL - Electrical Underground Passed
02/20/2024 COT - RSPL - Sewer Passed
02/20/2024 COT - RSPL - Plumbing Final Passed
02/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/20/2024 COT - RSPL - Rough Soil Passed
02/20/2024 COT - RSPL - Yard Water Line Passed
02/20/2024 COT - RSEL - Electrical Final Passed
02/20/2024 RSBU - Building Final Passed
02/20/2024 COT - RSME - Mechanical Final Passed
02/20/2024 COT - RSBU - Roof Nailing Passed
02/20/2024 COT - LCBU - Framing Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MODEL ENERGY REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT_T22CM04348 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-T22CM04348 RESPONSE LTR 2_V2.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT_T22CM04348.PDF DOCUMENTS VIEW
MODEL ENERGY REPORT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW