Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
|
| 01/04/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
pending license contractor statement, stating they will take responsibility for the work that’s been done. |
| 02/20/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 02/20/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 09/12/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed. 9/12/2023 |
| 10/03/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed |
| 10/03/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
10/3/23: Pending a letter from license contractor stating they'll take full responsibility of the life of the building and the work that's been completed |
| 11/22/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
No front porch according to the plans. No ani tip hold down for stove. No hammer arrestor. Provide ladder to check the unit on the roof. Smoke detector needs to be 3’ from register. Not built according to plan. Provide arc fault breakers per plan. Provide a UFER for electrical panel. Re submit a revision on how the house is built. Ceiling fans are too low. Need to be flushed to ceiling. STOPPED INSPECTION. 11/22/2023 |
| 11/22/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
No front porch according to the plans. No ani tip hold down for stove. No hammer arrestor. Provide ladder to check the unit on the roof. Smoke detector needs to be 3’ from register. Not built according to plan. Provide arc fault breakers per plan. Provide a UFER for electrical panel. Re submit a revision on how the house is built. Ceiling fans are too low. Need to be flushed to ceiling. STOPPED INSPECTION. 11/22/2023 |