Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM04001
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3780 E VALENCIA RD
Address NEW:
3780 E VALENCIA RD
Apply Date:
05/25/2022
Applicant:
Description:
Shell Bldg.
Permit Reviews
Permit Number - T22CM04001
Permit Status: Complete
Permit Description: Shell Bldg.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/25/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/07/2022 | COMPLETED |
| 07/12/2022 | RESUBMITTAL | 08/31/2022 | COMPLETED |
| 09/29/2022 | RESUBMITTAL | 10/13/2022 | COMPLETED |
| 12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
| 12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
| 12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
| 11/09/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/21/2022 | REQUIRES RESUBMIT |
| 12/16/2022 | COMMERCIAL REVIEW - FULL v.2 | 12/21/2022 | APPROVED |
| 01/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/16/2024 | APPROVED |
Conditions
Permit Number - T22CM04001
Permit Status: Complete
Permit Description: Shell Bldg.
| Date | Description | Comments |
|---|---|---|
| 12/15/2022 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 01/10/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/10/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/10/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 01/10/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 12/15/2022 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
| 01/10/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/15/2022 | ??? Designs must be submitted and approved prior to ... | |
| 12/15/2022 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 01/10/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 01/10/2024 | Steel Decking, Welding | |
| 01/10/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 12/15/2022 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04001
Permite Description: Shell Bldg.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2023 | COT - HCBU - Building Above Ceiling | N/A | Not Applicable | |
| 10/03/2023 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Applicable | |
| 10/03/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | |
| 10/03/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Applicable | |
| 07/11/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | for light pole bases on building 2 southwest side to south east side 5 each, ok to place concrete, as marked on plans |
| 02/22/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | E.5 line 7 to 13 underground sanitary sewer complete and holding water. |
| 11/15/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Knox box keys, Exit sign South/west man door not working in em operation. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04001
Permit Description: Shell Bldg.
Total Completed Inspections - 29
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 06/05/2023 | COT - HCEL - Grounding/Bonding | Passed | ||
| 06/26/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
| 08/23/2023 | COT - HCME - Mechanical Progress | Passed | ||
| 09/19/2023 | COT - HCEL - Electrical Intermediate | Passed | 9/19/23: all electrical conduit properly supported and ran per plan (warehouse Area A and B electrical above ceiling and on walls ok to proceed) | |
| 09/19/2023 | COT - HCME - Mechanical Final | Passed | 9/19/23: Exhaust fans passed | |
| 10/03/2023 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 10/03/2023 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 10/03/2023 | COT - HCBU - Framing | Passed | ||
| 10/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/03/2023 | COT - HCPL - Sewer | Passed | ||
| 10/13/2023 | BULD - Electrical Clearance | Passed | Approved for (4) service panels/meters under 1 address, ECO Clearances to TEP are required for meters #100, #200, #HSE, #FPMP | |
| 10/19/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 10/19/2023 | COT - HCBU - Preslab | Passed | ||
| 10/19/2023 | COT - HCPL - Rough Soil | Passed | ||
| 10/19/2023 | COT - HCBU - Building Progress | Passed | ||
| 10/19/2023 | COT - HCEL - Electrical Progress | Passed | ||
| 10/19/2023 | COT - HCEL - Electrical Underground | Passed | ||
| 10/19/2023 | COT - HCEL - Outdoor Lighting | Passed | ||
| 10/19/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
| 10/19/2023 | COT - HCPL - Plumbing Progress | Passed | ||
| 10/19/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 10/19/2023 | COT - HCPL - Yard Water Line | Passed | ||
| 11/16/2023 | COT - HCEL - Electrical Final | Passed | ||
| 11/16/2023 | COT - HCPL - Plumbing Final | Passed | ||
| 11/16/2023 | COT - HCPL - Backwater Valve | Passed | ||
| 11/17/2023 | COT - FCON - Fire - Final | Passed | ||
| 12/14/2023 | COT - HCBU - Building Final | Passed | 12/14/23:Building final for shell only. | |
| 12/14/2023 | COT - HCBU - CofO | Passed | 12/14/23: Building final for shell only. |