Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/25/2022
Applicant:
Description:
Shell Bldg.

Permit Reviews

Permit Number - T22CM04001
Permit Status: Complete
Permit Description: Shell Bldg.
Start Date Submittal Complete Date Status  
05/25/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/07/2022 COMPLETED Review Details
07/12/2022 RESUBMITTAL 08/31/2022 COMPLETED Review Details
09/29/2022 RESUBMITTAL 10/13/2022 COMPLETED Review Details
12/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 REQUIRES RESUBMIT Review Details
12/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 REQUIRES RESUBMIT Review Details
12/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2023 REQUIRES RESUBMIT Review Details
11/09/2022 COMMERCIAL REVIEW - FULL v.1 11/21/2022 REQUIRES RESUBMIT Review Details
12/16/2022 COMMERCIAL REVIEW - FULL v.2 12/21/2022 APPROVED Review Details
01/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/16/2024 APPROVED Review Details

Conditions

Permit Number - T22CM04001
Permit Status: Complete
Permit Description: Shell Bldg.
Date Description Comments
12/15/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
01/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/10/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/10/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/15/2022 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
01/10/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
12/15/2022 ??? Designs must be submitted and approved prior to ...
12/15/2022 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/10/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/10/2024 Steel Decking, Welding
01/10/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
12/15/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM04001
Permite Description: Shell Bldg.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/03/2023 COT - HCBU - Building Above Ceiling N/A Not Applicable
10/03/2023 COT - HCBU - Exterior Clips/Sheathing N/A Not Applicable
10/03/2023 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
10/03/2023 COT - HCPL - Plumbing Above Ceiling N/A Not Applicable
07/11/2023 COT - HCEL - Electrical Underground N/A Partial Pass for light pole bases on building 2 southwest side to south east side 5 each, ok to place concrete, as marked on plans
02/22/2023 COT - HCPL - Plumbing Progress N/A Partial Pass E.5 line 7 to 13 underground sanitary sewer complete and holding water.
11/15/2023 COT - FCON - Fire - Final N/A Partial Pass Knox box keys, Exit sign South/west man door not working in em operation.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM04001
Permit Description: Shell Bldg.
Total Completed Inspections - 29
Date Description Inspector Results Comments
05/17/2023 COT - HCBU - Roof Nailing Passed
06/05/2023 COT - HCEL - Grounding/Bonding Passed
06/26/2023 COT - HCBU - Masonry Pregrout Passed
08/23/2023 COT - HCME - Mechanical Progress Passed
09/19/2023 COT - HCEL - Electrical Intermediate Passed 9/19/23: all electrical conduit properly supported and ran per plan (warehouse Area A and B electrical above ceiling and on walls ok to proceed)
09/19/2023 COT - HCME - Mechanical Final Passed 9/19/23: Exhaust fans passed
10/03/2023 COT - HCBU - Stem Wall/Retaining Wall Passed
10/03/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
10/03/2023 COT - HCBU - Framing Passed
10/03/2023 COT - HCBU - Interior Shear Bracing Passed
10/03/2023 COT - HCPL - Sewer Passed
10/13/2023 BULD - Electrical Clearance Passed Approved for (4) service panels/meters under 1 address, ECO Clearances to TEP are required for meters #100, #200, #HSE, #FPMP
10/19/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
10/19/2023 COT - HCBU - Preslab Passed
10/19/2023 COT - HCPL - Rough Soil Passed
10/19/2023 COT - HCBU - Building Progress Passed
10/19/2023 COT - HCEL - Electrical Progress Passed
10/19/2023 COT - HCEL - Electrical Underground Passed
10/19/2023 COT - HCEL - Outdoor Lighting Passed
10/19/2023 COT - HCME - Mechanical Intermediate Passed
10/19/2023 COT - HCPL - Plumbing Progress Passed
10/19/2023 COT - HCPL - Plumbing Intermediate Passed
10/19/2023 COT - HCPL - Yard Water Line Passed
11/16/2023 COT - HCEL - Electrical Final Passed
11/16/2023 COT - HCPL - Plumbing Final Passed
11/16/2023 COT - HCPL - Backwater Valve Passed
11/17/2023 COT - FCON - Fire - Final Passed
12/14/2023 COT - HCBU - Building Final Passed 12/14/23:Building final for shell only.
12/14/2023 COT - HCBU - CofO Passed 12/14/23: Building final for shell only.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
BLDG 2 - 3 STERILIZATION REPORT-2024-01-09_V1.PDF DOCUMENTS VIEW
CITY OF TUCSON SI CERTS T22CM04001 - BUILDING 2-2023-12-18_V1-2023-12-18_V1.PDF DOCUMENTS VIEW
EQ SEWER DA_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SUB 5 TUCSON COMMERCE CENTER WATER AND SEWER PLANS_V1.PDF DOCUMENTS VIEW
SUB 5 TUCSON COMMERCE CENTER BUILDING 2 PLAN SET 2022-11-10 T22CM04001_V1.PDF DOCUMENTS VIEW