| 02/02/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
LinesB - E columns 2 - 18 okay for concrete. |
| 02/03/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
footing lines 1 from A TO F, and A-1 to A19 are good to pour. |
| 02/10/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
A thru f on the 19 line and F1 to F19 footing are complete ready for concrete pour. |
| 03/20/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
3 - 25 tilt up wall panels okay for concrete. 3/20/2023 |
| 03/28/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Building #2 tilt panels 54 - 76 okay for concrete. 3/28/2023 |
| 04/03/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Building #2 tilt panels 101 - 112 and #26 4/3/2023 okay for concrete placement. |
| 07/11/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
for light pole bases on building 2 southwest side to south east side 5 each, ok to place concrete, as marked on plans |
| 07/19/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
building light pole bases as marked on plans ok to place concrete , |
| 10/19/2023 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
|