Permit: T22CM03994
Permit Details
Apply Date:
05/25/2022
Applicant:
Description:
Shell bldg
Permit Reviews
Permit Number - T22CM03994
Permit Status: Complete
Permit Description: Shell bldg
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/25/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/07/2022 | COMPLETED |
07/12/2022 | RESUBMITTAL | 08/09/2022 | COMPLETED |
09/29/2022 | RESUBMITTAL | 10/13/2022 | COMPLETED |
03/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/01/2023 | REQUIRES RESUBMIT |
11/21/2022 | COMMERCIAL REVIEW - FULL v.2 | 12/20/2022 | APPROVED |
12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/19/2023 | APPROVED |
11/09/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/10/2022 | REQUIRES RESUBMIT |
03/13/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/15/2023 | REQUIRES RESUBMIT |
01/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/12/2024 | APPROVED |
07/06/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/10/2023 | APPROVED |
12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM03994
Permit Status: Complete
Permit Description: Shell bldg
Date | Description | Comments |
---|---|---|
12/13/2022 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
07/10/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
07/10/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/10/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
12/13/2022 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
01/12/2024 | ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD0017 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ | |
07/10/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
12/13/2022 | Steel bar joists and joist girder designs must be submitted and approved prior to intermediate inspections | |
12/13/2022 | Structural steel and steel connection designs must be submitted and approved prior to intermediate inspections | |
12/13/2022 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/13/2022 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/10/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
07/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
12/13/2022 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03994
Permite Description: Shell bldg
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/02/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Partial pass. 1400' of domestic water 2" line teed off to 3/4" above ceiling all well supported, labeled and under pressure. 6/2/2023 |
10/03/2023 | COT - HCBU - Building Above Ceiling | N/A | Not Applicable | |
10/03/2023 | COT - HCME - Mechanical Underground | N/A | Not Applicable | |
10/03/2023 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Applicable | |
10/03/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/03/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | |
10/03/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Applicable | |
07/11/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | partial approval for light pole bases building 2, south west corner, along south side going east, 5 each marked on plans |
07/11/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | for light pole bases on building 2 southwest side to south east side 5 each, ok to place concrete, as marked on plans |
COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03994
Permit Description: Shell bldg
Total Completed Inspections - 27
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2023 | COT - HCBU - Roof Nailing | Passed | pass | |
06/26/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
08/23/2023 | COT - HCPL - Plumbing Progress | Passed | ||
08/23/2023 | COT - HCME - Mechanical Progress | Passed | ||
09/19/2023 | COT - HCME - Mechanical Final | Passed | 9/19/23: Exhaust fans passed | |
09/19/2023 | COT - HCEL - Electrical Progress | Passed | 9/19/23: all electrical conduit properly supported and ran per plan (warehouse Area A and B electrical above ceiling and on walls ok to proceed) | |
10/03/2023 | COT - HCBU - Framing | Passed | ||
10/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
10/03/2023 | COT - HCPL - Sewer | Passed | ||
10/13/2023 | BULD - Electrical Clearance | Passed | Approved for (4) service panels/meters under 1 address, ECO Clearances to TEP are required for meters #100, #200, #HSE, #FPMP | |
10/19/2023 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
10/19/2023 | COT - HCEL - Grounding/Bonding | Passed | ||
10/19/2023 | COT - HCPL - Yard Water Line | Passed | ||
10/19/2023 | COT - HCEL - Electrical Underground | Passed | ||
10/19/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
10/19/2023 | COT - HCBU - Preslab | Passed | ||
10/19/2023 | COT - HCPL - Rough Soil | Passed | ||
10/19/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
10/19/2023 | COT - HCEL - Outdoor Lighting | Passed | ||
10/19/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
10/19/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
10/19/2023 | COT - HCBU - Building Progress | Passed | ||
11/16/2023 | COT - HCPL - Backwater Valve | Passed | ||
11/16/2023 | COT - HCEL - Electrical Final | Passed | ||
11/16/2023 | COT - HCPL - Plumbing Final | Passed | ||
11/17/2023 | COT - FCON - Fire - Final | Passed | ||
12/14/2023 | COT - HCBU - Building Final | Passed | 12/14/23: Building final for shell only. |