Permit: T22CM03964
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
8786 E PLACITA RIO DE VIDRIO
Address NEW:
8786 E PLACITA RIO DE VIDRIO
Apply Date:
05/24/2022
Applicant:
Jose Santos
Description:
SFR GRR2757T T21-M0095
Permit Reviews
Permit Number - T22CM03964
Permit Status: Issued
Permit Description: SFR GRR2757T T21-M0095
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/24/2022 | OTHER | 07/07/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM03964
Permit Status: Issued
Permit Description: SFR GRR2757T T21-M0095
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/24/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 05/24/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 05/24/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 05/24/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
| 07/07/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03964
Permite Description: SFR GRR2757T T21-M0095
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2023 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 06/14/2023 | COT - RSPL - Sewer | N/A | Not Applicable | 6/14/23: septic system |
| 06/14/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready | 6/14/23: no access |
| 06/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 6/14/23: no access |
| 06/14/2023 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 6/14/23: no access |
| 06/14/2023 | RSBU - Building Final | N/A | Re-inspection required | 6/14/23: no access |
| 06/14/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 6/14/23: no access |
| 06/14/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 6/14/23: no access |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03964
Permit Description: SFR GRR2757T T21-M0095
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 07/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 07/26/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 07/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
| 08/04/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} | |
| 08/04/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} | |
| 10/12/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 10/12/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 10/12/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} | |
| 01/12/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/12/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/12/2023 | COT - RSEL - Construction Power | Passed | ||
| 01/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/12/2023 | COT - LCBU - Framing | Passed | ||
| 02/16/2023 | PDSD Building Division - Unspecified In-Field | Passed | Drywall nailing. | |
| 06/01/2023 | COT - BULD - SWG Clearance | Passed | ||
| 06/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/14/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 06/14/2023 | RSME - Mechanical Progress | Passed | ||
| 06/16/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 06/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/16/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/20/2023 | RSBU - Building Final | Passed | ||
| 06/20/2023 | COT - RSEL - Electrical Final | Passed | ||
| 06/20/2023 | COT - RSME - Mechanical Final | Passed |