Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 06/14/2023 | RSBU - Building Final | Re-inspection required | 6/14/23: no access | |
| 06/16/2023 | RSBU - Building Final | Re-inspection required | 6/14/23: no access 6/16/23: A/C unit #2 needs locks on refrigerant lines, Unit #2 condenser needs 3" clearance from grade. Condensate drain on east side needs 6" clearance from grade. A/C Unit #1 needs locks on refrigerant lines, A/C unit #1 is over fused (max fuse is 20 Amp), Unit #1 needs 3" clearance from grade. B-vent in garage furnace needs 1" clearance from combustibles. Address is missing on property |
|
| 06/20/2023 | RSBU - Building Final | Passed |