Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: COT - RSEL - Electrical Final 

Date Description Inspector Results Comments
10/27/2022 COT - RSEL - Electrical Final  Not Ready
06/14/2023 COT - RSEL - Electrical Final  Re-inspection required 6/14/23: no access
06/16/2023 COT - RSEL - Electrical Final  Re-inspection required 6/14/23: no access

6/16/23: A/C unit #2 needs locks on refrigerant lines, Unit #2 condenser needs 3" clearance from grade. Condensate drain on east side needs 6" clearance from grade. A/C Unit #1 needs locks on refrigerant lines, A/C unit #1 is over fused (max fuse is 20 Amp), Unit #1 needs 3" clearance from grade. B-vent in garage furnace needs 1" clearance from combustibles.
06/20/2023 COT - RSEL - Electrical Final  Passed