Permit: T22CM03900
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
201 E AVIATION DR UNIT 1
Address NEW:
201 E AVIATION DR UNIT 1
Apply Date:
05/23/2022
Applicant:
Brandon Filipp
Description:
R-Convert SFR into Duplex
Permit Reviews
Permit Number - T22CM03900
Permit Status: Issued
Permit Description: R-Convert SFR into Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/23/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/16/2022 | COMPLETED |
| 07/21/2022 | RESUBMITTAL | 08/15/2022 | COMPLETED |
| 09/15/2022 | RESUBMITTAL | 10/03/2022 | COMPLETED |
| 10/15/2022 | RESUBMITTAL | 10/19/2022 | COMPLETED |
| 03/23/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/24/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03900
Permit Status: Issued
Permit Description: R-Convert SFR into Duplex
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/29/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM03900
Permit Status: Issued
Permit Description: R-Convert SFR into Duplex
| Date | Description | Comments |
|---|---|---|
| 05/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03900
Permite Description: R-Convert SFR into Duplex
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Footings for North and West addition to unit #2. Ok to place concrete in progress areas. |
| 05/18/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | Unit #2, Ok to insulate and cover walls. |
| 02/16/2023 | COT - RSBU - Preslab | N/A | Partial Pass | Slab area at Northwest area of unit #1. Ok to place concrete in progress areas. |
| 09/20/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 9/20/23: Out door receptacles must be WR, GFI receptacle at laundry room and under sink for disposal, unit2 AC unit max breaker 35amp (50amp installed), Shut off valves missing at hose bibs. Hose bibs need to be anti-siphon. |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Service Upgrade | N/A | Not Ready | |
| 09/20/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 9/20/23: Out door receptacles must be WR, GFI receptacle at laundry room and under sink for disposal, unit2 AC unit max breaker 35amp (50amp installed), Shut off valves missing at hose bibs. Hose bibs need to be anti-siphon. |
| 10/27/2022 | RSME - Mechanical Progress | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 09/20/2023 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 9/20/23: Out door receptacles must be WR, GFI receptacle at laundry room and under sink for disposal, unit2 AC unit max breaker 35amp (50amp installed), Shut off valves missing at hose bibs. Hose bibs need to be anti-siphon. |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03900
Permit Description: R-Convert SFR into Duplex
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2023 | BULD - Electrical Clearance | Passed | Note: 201 E Aviation Dr is being converted into a Duplex, units #1 and #2 (INCR clearance to TEP for unit #1, ECO clearance to TEP for unit #2) |
|
| 05/18/2023 | COT - RSBU - Roof Nailing | Passed | Ok to dry in roof system. | |
| 05/18/2023 | COT - LCBU - Framing | Passed | Ok to insulate and cover walls. | |
| 06/08/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and Sheetrock walls. | |
| 09/27/2023 | RSBU - Building Final | Passed | Corrections were made. 9/27/2023 | |
| 09/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/27/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 09/27/2023 | COT - RSBU - Preslab | Passed | ||
| 09/27/2023 | COT - RSEL - Electrical Final | Passed | Corrections were made. 9/27/2023 | |
| 09/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/27/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/27/2023 | COT - RSEL - Service Upgrade | Passed | N/a | |
| 09/27/2023 | COT - RSME - Mechanical Final | Passed | Corrections were made. 9/27/2023 | |
| 09/27/2023 | RSME - Mechanical Progress | Passed | ||
| 09/27/2023 | COT - RSPL - Gas Pressure Test | Passed | N/a | |
| 09/27/2023 | COT - RSPL - Plumbing Final | Passed | Corrections were made. 9/27/2023 | |
| 09/27/2023 | COT - RSPL - Rough Soil | Passed |