Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1255 S BEVERLY AV
Apply Date:
05/18/2022
Applicant:
Cary Broschat
Description:
180kW AC Photovoltaic Shade Structure Installation

Permit Reviews

Permit Number - T22CM03813
Permit Status: Complete
Permit Description: 180kW AC Photovoltaic Shade Structure Installation
Start Date Submittal Complete Date Status  
05/18/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 09/15/2022 COMPLETED Review Details
11/18/2022 COMMERCIAL REVIEW - FULL v.1 12/19/2022 APPROVED Review Details
04/27/2023 COMMERCIAL REVIEW - FULL v.1 04/27/2023 APPROVED Review Details

Conditions

Permit Number - T22CM03813
Permit Status: Complete
Permit Description: 180kW AC Photovoltaic Shade Structure Installation
Date Description Comments
06/06/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
06/06/2022 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM03813
Permite Description: 180kW AC Photovoltaic Shade Structure Installation
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/12/2023 PDSD Building Division - Unspecified Remote Video N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: T22CM03813
Permit Description: 180kW AC Photovoltaic Shade Structure Installation
Total Completed Inspections - 10
Date Description Inspector Results Comments
12/20/2022 COT - LCBU - Building Progress Passed Approved for foundations of canopy structure at pump 2 location, okay for concrete placement
12/20/2022 COT - LCEL - Grounding/Bonding Passed 15’ column depth
03/27/2023 COT - LCEL - Outdoor Lighting Passed
03/27/2023 COT - LCEL - Electrical Intermediate Passed
03/27/2023 COT - LCEL - Electrical Underground Passed
04/04/2023 ENGR Engineering Final Passed N/A
04/04/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/11/2023 BULD - Electrical Clearance Passed Approved, DGC/DGL Clearance to TEP is required
04/28/2023 COT - LCEL - Electrical Final Passed
06/01/2023 COT - LCEL - Electrical Progress Passed