Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 03/16/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial, DGL clearance was called into TEP at 11:00am, pump 2 (meter# 151515701) |
| 03/27/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
3/27/23 - Partial pass for DGC components. Need address correction from 1249 to 1237 for final sign off. |
| 04/04/2023 |
BULD - Electrical Clearance |
|
Passed |
|
| 04/11/2023 |
BULD - Electrical Clearance |
|
Passed |
Approved, DGC/DGL Clearance to TEP is required |