Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
532 E LAGUNA ST 01
Apply Date:
05/17/2022
Applicant:
alex enoch
Description:
DUPLEX LOOP2 T21-M0025

Permit Reviews

Permit Number - T22CM03751
Permit Status: Issued
Permit Description: DUPLEX LOOP2 T21-M0025
Start Date Submittal Complete Date Status  
05/17/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/24/2022 COMPLETED Review Details
05/31/2022 RESUBMITTAL 06/03/2022 COMPLETED Review Details
06/09/2022 RESUBMITTAL 06/14/2022 COMPLETED Review Details
06/14/2022 RESUBMITTAL 06/15/2022 COMPLETED Review Details
06/21/2022 RESUBMITTAL 06/27/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03751
Permit Status: Issued
Permit Description: DUPLEX LOOP2 T21-M0025
Total Outstanding Activity Conditions - 1
Date Name
05/17/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T22CM03751
Permit Status: Issued
Permit Description: DUPLEX LOOP2 T21-M0025
Date Description Comments
05/17/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM03751
Permite Description: DUPLEX LOOP2 T21-M0025
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
05/18/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 05/18/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
05/18/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 05/18/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
11/16/2022 COT - RSEL - Construction Power N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
12/08/2022 COT - RSPL - Plumbing Final N/A Partial Pass Main drains only. One overflow is via scupper, the second overflow remains to be inspected.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM03751
Permit Description: DUPLEX LOOP2 T21-M0025
Total Completed Inspections - 18
Date Description Inspector Results Comments
07/11/2022 COT - RSBU - Preslab Passed {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Termite treatment is to be performed before concrete is placed.}
07/11/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved . Ensure electric Ufer is in place before placement of concrete
}
08/15/2022 COT - RSPL - Yard Water Line Passed {Activity date: 08/15/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 06/29/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
3 pvc lines in same trench, for duplex and adjacent SFR - ok}
08/15/2022 COT - RSPL - Sewer Passed {Activity date: 08/15/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 08/12/2022; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by NGARCIA3 - nr
Per Pat}
08/15/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/15/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap
ABS and pex, from duplex to hcs and meter, ok to backfill.} ; {Activity date: 06/29/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - Pa
Interior duplex rough ok
}
10/03/2022 COT - RSBU - Roof Nailing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/28/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Denied. No plans on site. No access to roof. Complete roof and exterior sheathing before calling in inspection.

}
10/17/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 10/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 10/14/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready need plans on site}
11/16/2022 COT - RSEL - Grounding/Bonding Passed
11/18/2022 COT - RSEL - Construction Power Passed
12/06/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/06/2022 COT - LCBU - Framing Passed
12/08/2022 RSPL - Plumbing Progress Passed Roof drains.
05/04/2023 COT - RSEL - Outdoor Lighting Passed
01/06/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
05/04/2023 COT - RSME - Mechanical Final Passed
05/04/2023 COT - RSPL - Plumbing Final Passed
05/04/2023 COT - RSEL - Electrical Final Passed
10/12/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW