Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03725
Permit Details
Apply Date:
05/16/2022
Applicant:
Scott Price
Description:
Interior renovation with exterior guardrail and egress work - new sprinkler and life-safety systems
Permit Reviews
Permit Number - T22CM03725
Permit Status: Issued
Permit Description: Interior renovation with exterior guardrail and egress work - new sprinkler and life-safety systems
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/17/2022 | 3RD PARTY REVIEW - COMMERCIAL TI | 06/21/2022 | ACTIVE |
11/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/22/2024 | APPROVED |
08/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
08/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/10/2024 | APPROVED |
12/20/2022 | COMMERCIAL REVIEW - FULL v.2 | 01/06/2023 | APPROVED |
10/27/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/16/2022 | REQUIRES RESUBMIT |
05/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/22/2023 | APPROVED |
11/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/19/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM03725
Permit Status: Issued
Permit Description: Interior renovation with exterior guardrail and egress work - new sprinkler and life-safety systems
Date | Description | Comments |
---|---|---|
01/05/2023 | Please contact Pima County Addressing to resolve your addressing issue related to 475 N GRANADA AV Unit:BLDG 7. Addressing@pima.gov or 520-724-9512 | |
01/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
03/26/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03725
Permite Description: Interior renovation with exterior guardrail and egress work - new sprinkler and life-safety systems
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | Gas line needs to be under pressure. |
10/03/2024 | COT - LCBU - Building Final | N/A | Partial Pass | Repeat requested inspection. |
10/03/2024 | COT - HCME - Kitchen Hood | N/A | Not Applicable | No hood in the building. |
09/18/2024 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | Level #1, room units. Ok to insulate and cover walls. |
09/18/2024 | COT - HCBU - Building Final | N/A | Partial Pass | Level #2, room units and corridors. |
10/03/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Old not in use fire alarm equipment needs to be removed. Knox box for building 8 to access FACP, FACP sign |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03725
Permit Description: Interior renovation with exterior guardrail and egress work - new sprinkler and life-safety systems
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/17/2024 | COT - HCPL - Rough Soil | Passed | Levels #1 - #4 bathrooms. | |
05/17/2024 | COT - HCME - Mechanical Intermediate | Passed | Room units on Levels #1 - #4. | |
05/17/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | Penetrations in decking between floor levels. | |
05/17/2024 | COT - HCBU - Framing | Passed | Room units on Levels #1 - #4. | |
05/17/2024 | COT - HCPL - Plumbing Intermediate | Passed | Room unit bathrooms; Ok to in fill progress areas in room units on Levels #1 - #4. | |
05/17/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Room units bathroom exhaust on Levels #1 - #4. | |
05/17/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | Room,units on Levels #1 - #4. | |
06/06/2024 | COT - BULD - SWG Clearance | Passed | Two inch gas line for service to boiler. Reconnect gas meter. | |
06/06/2024 | BULD - Electrical Clearance | Passed | Clearance for meter sets for Electric Vehicle charging stations on buildings #7, #4, #2. | |
06/06/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
06/06/2024 | COT - HCEL - Electrical Underground | Passed | Underground service for Electric Vehicle charging station. | |
06/27/2024 | COT - HCPL - Gas Final | Passed | Gas line and service for boiler. | |
07/25/2024 | COT - HCEL - Grounding/Bonding | Passed | Building grounded throughout. | |
08/27/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
10/03/2024 | COT - HCME - Mechanical Final | Passed | ||
10/03/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
10/03/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
10/03/2024 | COT - HCPL - Plumbing Final | Passed | ||
10/03/2024 | COT - HCEL - Electrical Final | Passed | ||
10/03/2024 | COT - HCBU - Interior Shear Bracing | Passed |