Permit: T22CM03654
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6520 E CALLE HERCULO
Address NEW:
6520 E CALLE HERCULO
Apply Date:
05/13/2022
Applicant:
Keith Michaud
Description:
Master Suite Addition and Remodel
Permit Reviews
Permit Number - T22CM03654
Permit Status: Issued
Permit Description: Master Suite Addition and Remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2024 | APPROVED |
| 03/22/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/18/2023 | APPROVED |
Conditions
Permit Number - T22CM03654
Permit Status: Issued
Permit Description: Master Suite Addition and Remodel
| Date | Description | Comments |
|---|---|---|
| 08/16/2022 | SHOP DRAWINGS REQUIRED FOR PREFAB WOOD TRUSSES | |
| 08/16/2022 | SHOP DRAWINGS REQUIRED FOR MANUAL J MECHANICAL | |
| 10/02/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/02/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/16/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03654
Permite Description: Master Suite Addition and Remodel
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 03/07/2023 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 05/02/2023 | RSME - Mechanical Progress | N/A | Not Ready | 1. Provide sealed truss calcs, 2. Block register boxes, 3. Support vents mid-story & fill thru the roof, 4. Seal holes in top plate, 5. Complete lath around openings and seal penetrations, 6. New AC in garage and all new duct is not shown in the approved plans, nor is a detail for enclosing the unit hanging into the garage 5/2/23: support vents mid-story and water test thru the roof, seal all penetrations n the top plate, install AC unit in garage to allow for service and to seal off from attic. |
| 05/12/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 09/11/2023 | RSBU - Building Final | N/A | Re-inspection required | Provide approved plans to view the scope of work that's been done. 9/7/2023 9/11/23: install house address numbers, cut clean outs in front yard to grade, long kitchen counter requires 2 additional outlets, exposed flex duct in garage ceiling is not allowed.Remove all flex duct in garage and install hard metal duct. |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03654
Permit Description: Master Suite Addition and Remodel
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2023 | COT - RSPL - Rough Soil | Passed | plumbing underground is complete with a water test. ok to backfill. | |
| 01/13/2023 | COT - RSPL - Yard Water Line | Passed | water line connected to meter and operational. Ok to backfill trench. | |
| 01/13/2023 | COT - LCPL - Plumbing Intermediate | Passed | underground plumbing complete. Ok to backfill | |
| 01/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/25/2023 | COT - RSBU - Preslab | Passed | ||
| 02/14/2023 | COT - LCBU - Framing | Passed | ||
| 02/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/14/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/08/2023 | COT - RSEL - Service Upgrade | Passed | ||
| 06/08/2023 | BULD - Electrical Clearance | Passed | Approved, INCR Clearance for the service upgrade was called into TEP at 12:20pm (power-kill) | |
| 08/31/2023 | COT - BULD - SWG Clearance | Passed | Approved under TC-RES-0823-07546, SWG clearance required | |
| 08/31/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/04/2023 | RSME - Mechanical Progress | Passed | ||
| 10/04/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/04/2023 | RSBU - Building Final | Passed | 10-4-23: House numbers have been installed on front of garage, clean-outs have been cut to match grade with screw caps installed, exposed flex duct has been replaced with metal duct, and the kitchen is not part of the remodel so additional outlets were not needed. Okay to issue Certificate of Completion. | |
| 10/04/2023 | COT - RSEL - Electrical Final | Passed | 10-4-23: House numbers have been installed on front of garage, clean-outs have been cut to match grade with screw caps installed, exposed flex duct has been replaced with metal duct, and the kitchen is not part of the remodel so additional outlets were not needed. Okay to issue Certificate of Completion. | |
| 10/04/2023 | COT - RSME - Mechanical Final | Passed | Flex duct in garage has been replaced with new metal duct. Okay to issue Certificate of Completion. | |
| 10/04/2023 | COT - RSPL - Plumbing Final | Passed | 10-4-23: House numbers have been installed on front of garage, clean-outs have been cut to match grade with screw caps installed, exposed flex duct has been replaced with metal duct, and the kitchen is not part of the remodel so additional outlets were not needed. Okay to issue Certificate of Completion. |