Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM03546
Permit Details
Apply Date:
05/10/2022
Applicant:
Dustin Simmons
Description:
Park Restroom Structure, Sports lighting improvements.
Permit Reviews
Permit Number - T22CM03546
Permit Status: Issued
Permit Description: Park Restroom Structure, Sports lighting improvements.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/18/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 06/21/2022 | COMPLETED |
03/28/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/28/2023 | REQUIRES RESUBMIT |
05/15/2023 | COMMERCIAL REVIEW - FULL v.3 | 05/31/2023 | REQUIRES RESUBMIT |
06/23/2023 | ZZZBUILDING RESTAMP REVIEW v.1 | 06/27/2023 | APPROVED |
03/28/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/24/2023 | REQUIRES RESUBMIT |
06/15/2023 | COMMERCIAL REVIEW - FULL v.4 | 06/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM03546
Permit Status: Issued
Permit Description: Park Restroom Structure, Sports lighting improvements.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
06/11/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/11/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
06/11/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - T22CM03546
Permit Status: Issued
Permit Description: Park Restroom Structure, Sports lighting improvements.
Date | Description | Comments |
---|---|---|
07/19/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM03546
Permite Description: Park Restroom Structure, Sports lighting improvements.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | ES1.1. 2 1”1/2 conduits for food trucks. 200 amp service panels up to the service building. At 36”depth top of pipe. 2 4” conduit from parking lot to main walk path at 48” depth top of pipe. okay to backfill progress areas. Shading required. 2/15/2024 |
06/04/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | |
02/15/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | C5.1. 36” depth. 2’water line type k from meter to 60’ from building. Okay to backfill progress areas. 2/15/2024 |
01/31/2024 | COT - HCPL - Rough Soil | N/A | Partial Pass | 25´ center to first light pole west of hydrant. HCS connection. At 5´ depth to sub grade. From the curb about 16´7” at entry curb at a depth of 7´. Tie in to existing reclaimed water line. Refer to padre C5.1 1/31/2024 |
05/28/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | Partial pass. Stem wall approved at bathrooms and utility room. Okay to grout. 5/28/2024 |
02/21/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Little league field. ( A3,A4,A6,B3,B4,B5,B6) Soccer field. (S1,S2,S3,S4,S5,S6) Senior field. (A1,B1,C1,C2) LightStructureSystems. Okay for concrete placement. 2/21/2024 |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM03546
Permit Description: Park Restroom Structure, Sports lighting improvements.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/04/2024 | COT - HCPL - Rough Soil | Passed |