Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/29/2022
Applicant:
Description:
SFR 230.2690 T21-M0027

Outstanding Activity Conditions

Permit Number - T22CM03251
Permit Status: Issued
Permit Description: SFR 230.2690 T21-M0027
Total Outstanding Activity Conditions - 4
Date Name
04/29/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/29/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/29/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/29/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-100/P21WP00059, G-20-059/P20WP00060, G-20-089/P20WP00061 AND THE DOWNSTREAM OFFSITEPUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM03251
Permite Description: SFR 230.2690 T21-M0027
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/03/2022 COT - LCBU - Framing N/A Not Ready replace shear wall that has been cut. double studs need to be continuous for double girders. add blocking to registers. add titan bolts center third of the bottom plates. secure bracing for trusses that have been loosened. add sister stud to the loose stud on second floor 1st bedroom.
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
04/13/2023 RSME - Mechanical Progress N/A Re-inspection required

Completed Inspections

Permit Status: Issued
Permit Number: T22CM03251
Permit Description: SFR 230.2690 T21-M0027
Total Completed Inspections - 18
Date Description Inspector Results Comments
06/09/2022 COT - RSPL - Yard Water Line Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/09/2022 COT - RSPL - Sewer Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/09/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/20/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSBU - Preslab Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSEL - Electrical Underground Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/20/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/20/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/22/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/02/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 08/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/25/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR} ; {Activity date: 07/22/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE 1. Extend shear wall panels to the exterior face of wall per detail. 2. Missing double studs on first floor east wall that support girder trusses. 3. Remove all metal truss spacers that are hanging loose}
11/07/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/07/2022 COT - LCPL - Plumbing Intermediate Passed
12/02/2022 COT - HCBU - Interior Shear Bracing Passed
02/08/2023 COT - BULD - SWG Clearance Passed SWG for meter only
04/13/2023 COT - RSPL - Plumbing Final Passed
04/13/2023 COT - RSEL - Outdoor Lighting Passed
04/13/2023 COT - RSME - Mechanical Final Passed
04/13/2023 COT - RSEL - Electrical Final Passed
04/13/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW