Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - LCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - LCBU - Framing |
|
Not Ready |
|
| 07/25/2022 |
COT - LCBU - Framing |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - RI canceled |
| 11/03/2022 |
COT - LCBU - Framing |
|
Not Ready |
replace shear wall that has been cut. double studs need to be continuous for double girders. add blocking to registers. add titan bolts center third of the bottom plates. secure bracing for trusses that have been loosened. add sister stud to the loose stud on second floor 1st bedroom. |
| 11/07/2022 |
COT - LCBU - Framing |
|
Passed |
|