Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/13/2022
Applicant:
Description:
15,300sf, new retail building

Permit Reviews

Permit Number - T22CM02713
Permit Status: Complete
Permit Description: 15,300sf, new retail building
Start Date Submittal Complete Date Status  
04/13/2022 3RD PARTY REVIEW - COMMERCIAL 07/18/2022 COMPLETED Review Details
07/22/2022 RESUBMITTAL 07/29/2022 COMPLETED Review Details
08/19/2022 REVISION - - 1ST 10/04/2022 COMPLETED Review Details
05/10/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/11/2023 REQUIRES RESUBMIT Review Details
12/16/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/27/2023 APPROVED Review Details
05/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/22/2023 APPROVED Review Details
05/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/05/2023 APPROVED Review Details
05/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/25/2023 REQUIRES RESUBMIT Review Details
03/24/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/30/2023 APPROVED Review Details

Conditions

Permit Number - T22CM02713
Permit Status: Complete
Permit Description: 15,300sf, new retail building
Date Description Comments
07/15/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/15/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/15/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
07/15/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
07/15/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/15/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/15/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/29/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
07/15/2022 SPECIAL INSPECTION IS REQUIRED FOR EFIS.
07/15/2022 SHOP DRAWINGS REQUIRED FOR PREFABRICATED WOOD TRUSSES.
07/15/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT.
07/15/2022 SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT.
07/29/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02713
Permite Description: 15,300sf, new retail building
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
01/04/2023 COT - LCBU - Masonry Pregrout N/A Partial Pass 5th lift entry columns at front entrance
02/07/2023 COT - LCBU - Exterior Clips/Sheathing N/A Not Applicable
03/27/2023 COT - LCBU - Building Above Ceiling N/A Not Ready
03/27/2023 COT - LCPL - Plumbing Above Ceiling N/A Partial Pass partial approval for showroom only
03/27/2023 COT - LCEL - Electrical Above Ceiling N/A Partial Pass partial approval for showroom area only
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
05/10/2023 COT - FCON - Sprinkler - Final N/A Partial Pass Need to add a head under roll up door for coverage in stock room.
05/11/2023 COT - LCPL - Medical Gas Preconstruction Mtg N/A Not Applicable
03/27/2023 COT - LCME - Mechanical Intermediate N/A Partial Pass partial approval for ductwork in showroom area only
05/10/2023 COT - FCON - Fire - Final N/A Partial Pass Sprinkler head needs to be added under roll up door for coverage in stock room, FCAP sign
05/11/2023 COT - LCBU - Building Final N/A Partial Pass Need bacteria test and air balance reports to be submitted to Robert Sherry. Ok to move in operational equipment and train personnel.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02713
Permit Description: 15,300sf, new retail building
Total Completed Inspections - 34
Date Description Inspector Results Comments
09/20/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 09/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Perimeter footings and interior column footings. Ok to place concrete in progress areas.}
09/20/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 09/20/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Electric ufer in place. Ok to cover.}
10/04/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 10/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for perimeter walls, okay to grout}
10/11/2022 COT - LCPL - Yard Water Line Passed {Activity date: 10/11/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved from meter to building, okay to backfill progress areas}
10/13/2022 COT - LCPL - Rough Soil Passed {Activity date: 10/13/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Approved for sanitary lines within the building, okay to backfill progress areas

} ; {Activity date: 10/11/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
01/11/2023 COT - LCBU - Masonry Pregrout Passed
02/07/2023 COT - LCBU - Roof Nailing Passed
02/13/2023 COT - LCPL - Backwater Valve Passed backflow preventer is installed and has been certified by R G & Sons.

backwater valve is installed on domestic sewer line.
02/13/2023 COT - LCPL - Sewer Passed sewer lines are complete.
02/27/2023 COT - LCBU - Framing Passed Wall framing is complete with fire blocking at 10' on all walls.
02/27/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed Wall framing is complete with fire blocking at 10' on all walls.
03/13/2023 COT - LCEL - Electrical Intermediate Passed
03/27/2023 COT - LCME - Mechanical Above Ceiling Passed
04/17/2023 BULD - Electrical Clearance Passed Approved, ECO Clearance required to TEP for new 600A service
04/19/2023 COT - BULD - SWG Clearance Passed
05/03/2023 COT - LCBU - Building Above Ceiling Passed Electrical, mechanical, plumbing, & fire sprinkler system above ceilings in bathrooms, break room, hallway & office is complete. Okay to install ceiling tiles.
05/03/2023 COT - LCPL - Plumbing Above Ceiling Passed Plumbing above ceiling of bathrooms, break room, hallway & office is complete. Okay to install ceiling tiles.
05/03/2023 COT - LCEL - Electrical Above Ceiling Passed Electrical above ceiling of bathrooms, break room, hallway & office is complete. Okay to install ceiling tiles.
05/08/2023 COT - LCPL - Plumbing Final Passed
05/08/2023 COT - LCEL - Electrical Final Passed
05/10/2023 COT - FCON - Alarm - Final Passed
05/10/2023 COT - LCEL - Outdoor Lighting Passed Outdoor lighting is installed and operational.
05/11/2023 COT - FCON - Sprinkler - Final Passed
05/11/2023 COT - LCME - Mechanical Final Passed
05/11/2023 COT - LCPL - Gas Pressure Test Passed
05/11/2023 COT - LCBU - Sustainability Passed
05/11/2023 COT - LCEL - Construction Power Passed
05/11/2023 COT - LCME - Mechanical Intermediate Passed
05/11/2023 COT - HCBU - Exterior Clips/Sheathing Passed
05/11/2023 COT - HCBU - Interior Shear Bracing Passed
05/11/2023 COT - LCPL - Plumbing Intermediate Passed
05/16/2023 ENGR Engineering Final Passed
05/18/2023 COT - FCON - Fire - Final Passed
05/19/2023 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
APPROVAL LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CERT-2023-05-25_V3.PDF DOCUMENTS VIEW
20230525_082140-2023-05-25_V2.PDF DOCUMENTS VIEW
EIFS INSPECTION LETTER_STAMPED_V2.PDF DOCUMENTS VIEW
FINAL SIC_V1 (2)-2023-05-24_V1.PDF DOCUMENTS VIEW
LA-Z-BOY HOME FURNISHINGS (CHLORINATION REPORT)-2023-05-16_V1.PDF DOCUMENTS VIEW
LA-Z-BOY TAB REPORT_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
APPROVAL LETTER.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
RFI 025 ALTERNATE TRUSS HANGERS_C4E RESPONSE_V1.PDF DOCUMENTS VIEW
06100-01 ROOF TRUSS SUBMITTAL - REVIEWED_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
CERTIFICATE OF GOOD STANDING.PDF DOCUMENTS VIEW
COMCHECK ENVELOPE.PDF DOCUMENTS VIEW
GENERAL CONTRACTOR LETTER.PDF DOCUMENTS VIEW
CUTSHEETS_LIGHTING.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
PSA_STANTEC.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PERMIT.PDF DOCUMENTS VIEW
INSPECTION CARD.PDF DOCUMENTS VIEW