Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Backwater Valve
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCPL - Backwater Valve | Not Ready | ||
| 02/13/2023 | COT - LCPL - Backwater Valve | Passed | backflow preventer is installed and has been certified by R G & Sons. backwater valve is installed on domestic sewer line. |