Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2215 E 8TH ST
Address NEW:
2215 E 8TH ST
Apply Date:
04/13/2022
Applicant:
Description:
R-Rebuild Garage; Replace Studio Roof and SFR Door

Permit Reviews

Permit Number - T22CM02698
Permit Status: Complete
Permit Description: R-Rebuild Garage; Replace Studio Roof and SFR Door
Start Date Submittal Complete Date Status  
04/13/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/03/2022 COMPLETED Review Details
09/14/2022 RESUBMITTAL 09/27/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM02698
Permit Status: Complete
Permit Description: R-Rebuild Garage; Replace Studio Roof and SFR Door
Date Description Comments
09/26/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/27/2022 General Contractor Letter (GCL) or Owner/Builder Waiver required prior to permit issuance

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM02698
Permite Description: R-Rebuild Garage; Replace Studio Roof and SFR Door
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
12/08/2023 BULD - Electrical Clearance N/A Not Applicable 12/8/23: homeowner not home no access
12/08/2023 COT - RSEL - Electrical Final N/A Re-inspection required 12/8/23: homeowner not home no access
10/27/2023 COT - RSEL - Outdoor Lighting N/A Not Ready
12/08/2023 COT - RSME - Mechanical Final N/A Re-inspection required 12/8/23: homeowner not home no access
12/08/2023 RSME - Mechanical Progress N/A Re-inspection required 12/8/23: homeowner not home no access

Completed Inspections

Permit Status: Complete
Permit Number: T22CM02698
Permit Description: R-Rebuild Garage; Replace Studio Roof and SFR Door
Total Completed Inspections - 9
Date Description Inspector Results Comments
05/26/2023 RSBU - Building Final Passed
12/08/2023 COT - LCBU - Framing Passed
12/08/2023 COT - RSBU - Roof Nailing Passed
12/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/04/2024 BULD - Electrical Clearance Passed No electric clearance required; electric service is operational.
06/04/2024 COT - RSEL - Electrical Final Passed
06/04/2024 COT - RSEL - Outdoor Lighting Passed
06/04/2024 COT - RSME - Mechanical Final Passed
06/04/2024 RSME - Mechanical Progress Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENG STRUCTURAL REVIEW 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBW 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENG STRUCTURAL REVIEW.PDF DOCUMENTS VIEW
OBW.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW