Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3309 S 12TH AV
Address NEW:
3309 S 12TH AV
Apply Date:
03/14/2022
Applicant:
Angie Nieto
Description:
TI: auto repair shop

Permit Reviews

Permit Number - T22CM01851
Permit Status: Complete
Permit Description: TI: auto repair shop
Start Date Submittal Complete Date Status  
03/14/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 04/28/2022 COMPLETED Review Details
04/30/2022 RESUBMITTAL 05/10/2022 COMPLETED Review Details
05/26/2022 RESUBMITTAL 05/27/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL 10/19/2022 ACTIVE Review Details
08/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/26/2024 REQUIRES RESUBMIT Review Details
07/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/18/2024 APPROVED Review Details
08/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.6 08/15/2024 APPROVED Review Details
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 08/05/2024 REQUIRES RESUBMIT Review Details
08/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.4 08/06/2024 REQUIRES RESUBMIT Review Details
10/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/14/2024 APPROVED Review Details
01/04/2023 COMMERCIAL REVIEW - FULL v.1 02/02/2023 APPROVED Review Details
07/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2024 REQUIRES RESUBMIT Review Details
09/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/24/2024 APPROVED Review Details
07/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/25/2024 REQUIRES RESUBMIT Review Details
08/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.5 08/07/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM01851
Permit Status: Complete
Permit Description: TI: auto repair shop
Date Description Comments
06/10/2024 AIR BALANCING REPORT IS REQUIRED.
10/19/2022 Do not issue this permit until DP22-0040 has been issued
11/06/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/30/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
06/10/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
06/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/10/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/10/2024 BOOTH SPRINKLERS Designs must be submitted and approved prior to final.
06/10/2024 PAINT BOOTH Designs must be submitted and approved prior to final.
11/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/10/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/10/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
06/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/10/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01851
Permite Description: TI: auto repair shop
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/06/2022 COT - LCPL - Plumbing Final N/A Re-inspection required {Activity date: 05/06/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION}
12/12/2023 COT - HCBU - Building Progress N/A Partial Pass 12/12/23: Masonry walls at 8’ - 12’, North, East, West. Ok to place grout in progress areas. Next lift will be 5'8" (top out)
01/09/2024 COT - BULD - SWG Clearance N/A Not Ready
12/18/2023 COT - HCBU - Masonry Pregrout N/A Partial Pass 12/18/23 pre grout top out ok to place concrete
11/15/2023 COT - HCEL - Electrical Progress N/A Partial Pass Set new location for disconnect, awaiting approval from TEP
11/07/2023 COT - HCEL - Grounding/Bonding N/A Partial Pass 11/7/23 Partial approval for UFER
11/15/2023 COT - HCPL - Plumbing Progress N/A Partial Pass Plumbing underground for sink and clean-out in slab area. Ok to cover progress area.
11/15/2023 COT - LCEL - Electrical Underground N/A Partial Pass Conduit for power from garage area panel to new location for disconnect. Ok to cover progress areas.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01851
Permit Description: TI: auto repair shop
Total Completed Inspections - 25
Date Description Inspector Results Comments
11/07/2023 COT - HCBU - Excavation/Rebar/Zoning Passed 11/7/23 ok to place concrete
01/09/2024 COT - HCPL - Plumbing Intermediate Passed
01/09/2024 COT - HCBU - Roof Nailing Passed
01/09/2024 COT - HCBU - Framing Passed
01/11/2024 BULD - Electrical Clearance Passed Approved new service disconnect to existing SES, RECN Clearance was called into TEP at 9:45am
01/17/2024 COT - HCBU - Building Progress Passed 12/12/23: Masonry walls at 8’ - 12’, North, East, West. Ok to place grout in progress areas. Next lift will be 5'8" (top out)
12/18/23 pre grout top out ok to place concrete
1/17/24: Electrical rough-In per plan ok to proceed. Drywall ok to be installed on ceiling.
01/17/2024 COT - HCEL - Electrical Intermediate Passed 12/12/23: Masonry walls at 8’ - 12’, North, East, West. Ok to place grout in progress areas. Next lift will be 5'8" (top out)
12/18/23 pre grout top out ok to place concrete
1/17/24: Electrical rough-In per plan ok to proceed. Drywall ok to be installed on ceiling. Plumbing intermediate passed,
02/16/2024 COT - HCPL - Plumbing Roof Drains Passed
02/16/2024 COT - HCPL - Gas Pressure Test Passed
02/20/2024 COT - BULD - SWG Clearance Passed Approved gasp piping and pressure test, SWG Clearance is required
06/10/2024 COT - HCBU - Masonry Pregrout Passed
06/10/2024 COT - HCEL - Electrical Progress Passed
06/10/2024 COT - HCEL - Grounding/Bonding Passed
06/10/2024 COT - HCEL - Outdoor Lighting Passed
06/10/2024 COT - HCPL - Plumbing Progress Passed
06/10/2024 COT - LCEL - Electrical Underground Passed
06/10/2024 COT - HCEL - Electrical Final Passed
06/10/2024 COT - HCME - Mechanical Final Passed
06/10/2024 COT - HCME - Mechanical Intermediate Passed
06/10/2024 COT - HCPL - Plumbing Final Passed
07/23/2024 COT - HCBU - Building Final Passed 6/10/24: pending conditions. Vacuum breaker and insulation missing at exterior hose bibs.
7/23/24: corrections made. Ok for CofO
10/18/2024 COT - LCBU - Building Final Passed Duplicate inspection. Final closed out back in July. 10/18/2024
10/21/2024 COT - LCEL - Electrical Final Passed
10/21/2024 COT - LCME - Mechanical Final Passed
10/24/2024 COT - FCON - Fire - Final Passed Approved 6/10/24