Permit: T22CM01851

Parcel: 11903429A


Addresses:

3309 S 12TH AV

Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Date Description Inspector Results Comments
01/17/2024 COT - HCPL - Plumbing Progress  Partial Pass 12/12/23: Masonry walls at 8’ - 12’, North, East, West. Ok to place grout in progress areas. Next lift will be 5'8" (top out)
12/18/23 pre grout top out ok to place concrete
1/17/24: Electrical rough-In per plan ok to proceed. Drywall ok to be installed on ceiling. Plumbing intermediate passed,
02/16/2024 COT - HCPL - Plumbing Progress  Partial Pass
06/10/2024 COT - HCPL - Plumbing Progress  Passed
11/15/2023 COT - HCPL - Plumbing Progress  Partial Pass Plumbing underground for sink and clean-out in slab area. Ok to cover progress area.