Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2304 N FORGEUS AV 01
Apply Date:
03/11/2022
Applicant:
Description:
(T21DV03351) A/C units installed replacing evaporative coolers in 5 units, included interior electri

Permit Reviews

Permit Number - T22CM01806
Permit Status: Complete
Permit Description: (T21DV03351) A/C units installed replacing evaporative coolers in 5 units, included interior electri
Start Date Submittal Complete Date Status  
03/11/2022 OTHER 04/07/2022 COMPLETED Review Details
05/08/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 05/08/2025 REQUIRES RESUBMIT Review Details
07/18/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 07/22/2025 APPROVED Review Details
09/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/03/2025 APPROVED Review Details

Conditions

Permit Number - T22CM01806
Permit Status: Complete
Permit Description: (T21DV03351) A/C units installed replacing evaporative coolers in 5 units, included interior electri
Date Description Comments
07/22/2025 AIR BALANCING REPORT FOR SUPPLY AIR AND OUTSIDE AIR IS REQUIRED.
07/18/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01806
Permite Description: (T21DV03351) A/C units installed replacing evaporative coolers in 5 units, included interior electri
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/30/2025 COT - LCPL - Gas Pressure Test N/A Not Applicable
07/30/2025 COT - LCEL - Electrical Final N/A Not Ready
07/30/2025 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01806
Permit Description: (T21DV03351) A/C units installed replacing evaporative coolers in 5 units, included interior electri
Total Completed Inspections - 7
Date Description Inspector Results Comments
07/30/2025 COT - LCEL - Electrical Above Ceiling Passed
07/30/2025 COT - LCME - Mechanical Intermediate Passed
07/30/2025 COT - LCPL - Plumbing Final Passed
07/30/2025 COT - LCEL - Electrical Intermediate Passed
08/08/2025 COT - LCME - Mechanical Final Passed Approved. Corrections were made. 8/8/2025
08/15/2025 COT - LCEL - Electrical Final Passed
08/15/2025 BULD - Electrical Clearance Passed 8/15/25: TEP RECN CLEARANCE FOR 2304 N FORGEUS AV UNIT#04

Documents

File Name Document Type  
2304NFORGEUS AIRBALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
25-235 2304 N FORGEUS AVE SEALED CDS 7.10.2025_V1.PDF DOCUMENTS VIEW