Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/01/2022
Applicant:
Brad Samuels
Description:
210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities. Bldg 2

Permit Reviews

Permit Number - T22CM01450
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities. Bldg 2
Start Date Submittal Complete Date Status  
03/01/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 05/02/2022 COMPLETED Review Details
06/30/2022 RESUBMITTAL 07/19/2022 COMPLETED Review Details
08/12/2022 RESUBMITTAL 08/29/2022 COMPLETED Review Details
09/13/2022 RESUBMITTAL 09/26/2022 COMPLETED Review Details
10/03/2022 RESUBMITTAL 10/06/2022 COMPLETED Review Details
01/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01450
Permit Status: Complete
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities. Bldg 2
Date Description Comments
10/06/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/06/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SPECIAL INSPECTION IS REQUIRED FOR AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION.
10/06/2022 SHOP DRAWINGS REQUIRED FOR WOOD FLOOR JOISTS.
10/06/2022 SHOP DRAWINGS REQUIRED FOR TRUSSES, WOOD ROOF TRUSSES.
10/06/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE
10/20/2022 PCRWRD requests that the City of Tucson, add the PCRWRD Condition to the COT building permit #T22CM01449:ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE DISCHARGE AUTHORIZATION IS ISSUED BY PDEQ FOR THE PRIVATE SEWER #P22SD00039 Gerry KoziolPima County DSD-Building Codes/Wastewater Utility Fee201 N Stone Ave Tucson, AZ 85701(520)724-6503

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM01450
Permite Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities. Bldg 2
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
04/25/2023 COT - LCEL - Electrical Intermediate N/A Partial Pass third floor tower 1
05/04/2023 COT - LCPL - Backwater Valve N/A Not Applicable
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/25/2023 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
12/07/2023 COT - LCBU - Building Progress N/A Not Ready Extension on permit. 12/7/2023
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
05/22/2023 COT - LCBU - Building Above Ceiling N/A Partial Pass Plumbing & electrical rough-in for walls and ceiling is complete in the south side of the northeast quadrant of building.
02/14/2024 COT - LCBU - Sustainability N/A Not Applicable
05/22/2023 COT - LCEL - Electrical Progress N/A Partial Pass Electrical rough-in for walls and ceiling is complete in the south side of the northeast quadrant of building.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM01450
Permit Description: 210 unit apartment complex with clubhouse, landscaped courtyard and pool, and other amenities. Bldg 2
Total Completed Inspections - 32
Date Description Inspector Results Comments
12/07/2022 COT - LCPL - Rough Soil Passed
03/15/2023 COT - LCBU - Roof Nailing Passed
04/21/2023 COT - LCME - Mechanical Above Ceiling Passed first and 2nd floor tower 1 ok to insulate, third floor requires reinspect
04/21/2023 COT - LCPL - Plumbing Roof Drains Passed
04/28/2023 COT - LCBU - Excavation/Rebar/Zoning Passed 4/28/23: concrete slab has been poured.
04/28/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed Contractor has installed drywall tape around trusses and fire foamed openings of truss braces.
04/28/2023 COT - LCBU - Preslab Passed
04/28/2023 COT - HCPL - Rough Soil Passed 4/28/23: Rough soil is complete and concrete slab has been poured.
04/28/2023 COT - LCEL - Electrical Underground Passed Underground electrical is complete from transformer to service panel.
05/04/2023 COT - LCBU - Exterior Clips/Sheathing Passed
05/26/2023 COT - LCPL - Plumbing Above Ceiling Passed
05/26/2023 COT - LCPL - Plumbing Intermediate Passed
11/15/2023 COT - HCBU - Interior Shear Bracing Passed
11/15/2023 COT - LCPL - Sewer Passed
11/15/2023 COT - LCME - Mechanical Intermediate Passed
11/15/2023 COT - LCBU - Framing Passed
12/04/2023 COT - LCEL - Service Upgrade Passed 11/30/23: ECO panel HPB1 south end and units 2101,2102,2103,2104,2105,2106,2201,2202,2203,2204,2205,2206,2301,2302,2303,2304,2305,2306.

12/4/23:ECO Panel HPB2 North end of building, units: 2107,2108,2109,2110,2112,2113,2114,2207,2208,2209,2210,2211,2212,2213,2214,2307, 2308,2309,2310,2311,2312,2313,2314.
01/17/2024 COT - FCON - Sprinkler - Final Passed
01/18/2024 COT - FCON - Alarm - Final Passed
01/19/2024 COT - LCEL - Electrical Above Ceiling Passed
01/19/2024 COT - LCEL - Outdoor Lighting Passed
01/25/2024 BULD - Electrical Clearance Passed 1/25/2024- clerance emailed ECO GARG 3
1/29/24 clearance resent
01/25/2024 COT - FCON - Fire - Final Passed Ok for level 4 TCO.
02/14/2024 COT - LCBU - Building Progress Passed
02/14/2024 COT - LCPL - Plumbing Final Passed
02/14/2024 COT - LCME - Mechanical Final Passed
02/14/2024 COT - LCPL - Plumbing Progress Passed
02/14/2024 COT - LCBU - Building Above Ceiling Passed
02/14/2024 COT - LCEL - Electrical Final Passed
02/14/2024 COT - LCEL - Electrical Progress Passed
02/14/2024 COT - LCME - Mechanical Progress Passed
05/17/2024 COT - LCBU - Building Final Passed 1/25/24: units 2309-2312 need re-inspection, units 2113-2314 need re-inspection. All other units passed TCO will be given when units listed are complete.
1/26/24: Level 4 TCO all units in BLDG 2
5/17/24: building 2 ok for CofO