Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
02/11/2022
Applicant:
Description:
SFR MPLAN1510 T20-M0040

Permit Reviews

Permit Number - T22CM01074
Permit Status: Issued
Permit Description: SFR MPLAN1510 T20-M0040
Start Date Submittal Complete Date Status  
02/11/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/08/2022 COMPLETED Review Details
06/10/2022 RESUBMITTAL 06/17/2022 COMPLETED Review Details
05/15/2025 RESIDENTIAL NEW DWELLING v.1 06/17/2025 APPROVED Review Details
08/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/14/2025 REQUIRES RESUBMIT Review Details
08/19/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/20/2025 APPROVED Review Details
03/08/2024 RESIDENTIAL NEW DWELLING v.1 03/21/2024 APPROVED Review Details

Conditions

Permit Number - T22CM01074
Permit Status: Issued
Permit Description: SFR MPLAN1510 T20-M0040
Date Description Comments
02/11/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/09/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/09/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/21/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/21/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/21/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/21/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/21/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM01074
Permite Description: SFR MPLAN1510 T20-M0040
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
02/24/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 2-24-25, partial pass for ufer only.
03/28/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable house fully wrapped in plywood, not using interior shear
03/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass Passed 3/28/24 ok to drywall
05/12/2025 RSEL - Electrical Progress N/A Re-inspection required 5-12-25, block 4-gang box, firefoam all penetrations at top plates, DWV not under test, electrical receptacles/light switches not made up at missing stairs, electrical schedule does not match # of circuits-provide an updated schedule to the city for review/approval or add circuits according to approved plans. Exhaust's are not permitted to be located underneath soffits and prohibited from discharging onto a sidewalk, walking surface as it may cause moisture and a slippery surface. Duct termination shall terminate not less than 3' from in any direction from openings into buildings. Exhaust duct termination shall be equipped with a backdraft damper. See M1501.1, M1502.3 & M1502.3.2 for details. Also, add a CS16 strap to top plates where over notched more than 40% on interior non bearing framing.
05/12/2025 RSME - Mechanical Progress N/A Partial Pass
05/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 5/21/25
1. Partial pass; Okay to proceed with drywall on firewalls.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM01074
Permit Description: SFR MPLAN1510 T20-M0040
Total Completed Inspections - 17
Date Description Inspector Results Comments
01/22/2025 COT - RSPL - Rough Soil Passed Passed 1/22/25 ok to backfill
01/22/2025 COT - RSPL - Sewer Passed Passed 1/22/25 ok to backfill
02/07/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2/7/25 pass
02/07/2025 COT - RSBU - Preslab Passed 2/7/25 pass
03/28/2025 BULD - Electrical Clearance Passed Passed 3/28/25 ready for temp power clearance eco
03/28/2025 COT - RSBU - Roof Nailing Passed Roof nailing and truss per plan
04/07/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/29/2025 COT - RSPL - Yard Water Line Passed Main water line for lot #8, partial main line for lot #7. OK to cover progress areas.
05/12/2025 COT - RSPL - Gas Pressure Test Passed 5-12-25, approved.
05/12/2025 RSPL - Plumbing Progress Passed 5-12-25, block 4-gang box, firefoam all penetrations at top plates, DWV not under test, electrical receptacles/light switches not made up at missing stairs, electrical schedule does not match # of circuits-provide an updated schedule to the city for review/approval or add circuits according to approved plans. Exhaust's are not permitted to be located underneath soffits and prohibited from discharging onto a sidewalk, walking surface as it may cause moisture and a slippery surface. Duct termination shall terminate not less than 3' from in any direction from openings into buildings. Exhaust duct termination shall be equipped with a backdraft damper. See M1501.1, M1502.3 & M1502.3.2 for details. Also, add a CS16 strap to top plates where over notched more than 40% on interior non bearing framing. Condenser unit not installed.
06/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/10/2025 all corrections have been made. Okay to insulate and drywall.
06/18/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 6/18/25
Pass
12/03/2025 COT - RSEL - Electrical Final Passed
12/03/2025 COT - RSPL - Plumbing Final Passed
12/03/2025 RSBU - Building Final Passed
12/03/2025 COT - RSME - Mechanical Final Passed
12/03/2025 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
1364_SIC_153313 PT LOT 8 COMPLETE-2025-08-19_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
L8 -7-CIRCUIT REV_REVISION LETTER 05.12.25_V1.PDF DOCUMENTS VIEW
L8-7-CIRCUIT REV_V1 WITH ADDRESS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SENTINEL VISTA LOT 8 03.04.24_V1.PDF DOCUMENTS VIEW