Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/06/2022
Applicant:
Alex Pillion
Description:
New Multi-family Development Building 6

Permit Reviews

Permit Number - T22CM00131
Permit Status: Complete
Permit Description: New Multi-family Development Building 6
Start Date Submittal Complete Date Status  
01/06/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/04/2022 COMPLETED Review Details
02/26/2022 RESUBMITTAL 03/17/2022 COMPLETED Review Details
04/15/2022 RESUBMITTAL 04/26/2022 COMPLETED Review Details
02/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/27/2024 APPROVED Review Details

Conditions

Permit Number - T22CM00131
Permit Status: Complete
Permit Description: New Multi-family Development Building 6
Date Description Comments
12/14/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/19/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/19/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
04/19/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/26/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
04/19/2022 SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS
04/19/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM
04/19/2022 SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES
04/26/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
12/14/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00131
Permite Description: New Multi-family Development Building 6
Total Outstanding Inspections - 37
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
10/26/2022 COT - LCPL - Backwater Valve N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
01/05/2023 COT - HCBU - Building Progress N/A Partial Pass partial for stair footings okay for concrete
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
04/06/2023 COT - LCEL - Electrical Intermediate N/A Canceled Canceled per contractor. 4/6/2023
04/06/2023 COT - LCME - Mechanical Intermediate N/A Canceled Canceled per contractor. 4/6/2023
04/06/2023 COT - LCPL - Plumbing Intermediate N/A Canceled Canceled per contractor. 4/6/2023
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
06/22/2023 COT - HCPL - Plumbing Progress N/A Partial Pass Partial pass. Domestic water supply to buildings up to the T to the main line. Okay to backfill, shading required. 6/22/2023
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
07/13/2023 COT - LCEL - Electrical Progress N/A Partial Pass
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - FCON - Underground Flush N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
12/21/2023 ENGR Engineering Final N/A Partial Pass TC Of O Level 2 Building (6) will recall inspection at the end of next week 12/29/23.
12/21/2023 COT - HCBU - Building Final N/A Partial Pass Okay for TCO level 2

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00131
Permit Description: New Multi-family Development Building 6
Total Completed Inspections - 29
Date Description Inspector Results Comments
10/14/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 10/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/20/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 10/20/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
01/04/2023 COT - LCBU - Roof Nailing Passed
02/08/2023 COT - LCBU - Preslab Passed
06/30/2023 COT - LCPL - Plumbing Roof Drains Passed
04/07/2023 COT - LCEL - Electrical Intermediate Passed 1st through 3rd floor all M,E,P'S approved okay for insulation and drywall. 4/7/2023
04/07/2023 COT - LCME - Mechanical Intermediate Passed 1st through 3rd floor all M,E,P'S approved okay for insulation and drywall. 4/7/2023
04/07/2023 COT - LCPL - Plumbing Intermediate Passed 1st through 3rd floor all M,E,P'S approved okay for insulation and drywall. 4/7/2023
04/27/2023 COT - HCBU - Interior Shear Bracing Passed okay for tape and mud. 4/27/2023
09/22/2023 BULD - Electrical Clearance Passed Electrical panel, meter boxes, and sub panels are complete for Units 6101, 6102, 6103, 6104, 6201, 6202, 6203, 6204, 6301, 6302, 6303, 6304, & house panel. Okay to energize main electrical panel and meter boxes.
11/29/2023 COT - LCBU - Building Above Ceiling Passed
11/29/2023 COT - LCEL - Electrical Progress Passed
11/29/2023 COT - LCME - Mechanical Final Passed
11/29/2023 COT - LCME - Mechanical Progress Passed
11/29/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
11/29/2023 COT - LCEL - Outdoor Lighting Passed
11/29/2023 COT - LCEL - Electrical Final Passed
11/29/2023 COT - LCPL - Plumbing Above Ceiling Passed
11/29/2023 COT - LCEL - Electrical Above Ceiling Passed
12/21/2023 COT - FCON - Alarm - Final Passed
12/21/2023 COT - FCON - Sprinkler - Final Passed
12/21/2023 FCON – OH Piping & Hydro Passed
12/15/2023 COT - LCME - Mechanical Above Ceiling Passed
12/21/2023 COT - FCON - Underground Flush Passed
12/21/2023 COT - FCON - Fire - Final Passed
12/21/2023 COT - FCON - Underground Pressure Passed
01/31/2024 COT - LCBU - Building Final Passed 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
Ok for level 2 TCO
12/29/23: TCofO Level 4
1/31/24: ok for CofO
01/31/2024 ENGR Engineering Final Passed
01/31/2024 COT - HCBU - Building Final Passed 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
Ok for level 2 TCO
12/29/23: TCofO Level 4
1/31/24: ok for CofO

Documents

File Name Document Type  
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
ZONING DECISION LETTER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW