Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2024 | COT - HCBU - Building Final | Partial Pass | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. Ok for level 2 TCO 12/29/23: TCofO Level 4 |
|
| 01/31/2024 | COT - HCBU - Building Final | Passed | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. Ok for level 2 TCO 12/29/23: TCofO Level 4 1/31/24: ok for CofO |
|
| 12/15/2023 | COT - HCBU - Building Final | Re-inspection required | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. | |
| 12/21/2023 | COT - HCBU - Building Final | Partial Pass | Okay for TCO level 2 | |
| 12/29/2023 | COT - HCBU - Building Final | Partial Pass | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. Ok for level 2 TCO 12/29/23: TCofO Level 4 |