Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/06/2022
Applicant:
Alex Pillion
Description:
New Multi-family Development Building 5

Permit Reviews

Permit Number - T22CM00130
Permit Status: Complete
Permit Description: New Multi-family Development Building 5
Start Date Submittal Complete Date Status  
01/06/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/04/2022 COMPLETED Review Details
02/26/2022 RESUBMITTAL 03/17/2022 COMPLETED Review Details
04/15/2022 RESUBMITTAL 04/26/2022 COMPLETED Review Details
12/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2023 APPROVED Review Details
02/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/02/2024 REQUIRES RESUBMIT Review Details
01/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/25/2024 APPROVED Review Details
01/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/29/2024 APPROVED Review Details

Conditions

Permit Number - T22CM00130
Permit Status: Complete
Permit Description: New Multi-family Development Building 5
Date Description Comments
12/14/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/18/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
04/18/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/26/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
04/18/2022 SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS
04/18/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM
04/18/2022 SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES
02/02/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/26/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
01/30/2024 SPECIAL INSPECTION FOR structural steel IS REQUIRED
12/14/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00130
Permite Description: New Multi-family Development Building 5
Total Outstanding Inspections - 18
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
03/17/2023 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass Everything above trusses approved. Okay to proceed. 3/17/2023
12/12/2023 COT - LCBU - Sustainability N/A Not Applicable
10/26/2023 COT - LCPL - Backwater Valve N/A Partial Pass 10/26/23 partial approval, OK to cover supply pipes, waiting backwater valve certification
09/22/2023 COT - LCEL - Electrical Final N/A Canceled Cancelled per Don Vigil. Called in wrong inspection, needed inspection for electrical clearance.
12/15/2023 COT - LCPL - Plumbing Final N/A Re-inspection required 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
12/29/2023 COT - LCBU - Building Final N/A Partial Pass 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
12/21/23 ok for TCO level 4
12/29/23: TCofO Level 4
12/29/2023 ENGR Engineering Final N/A Partial Pass TC Of O level 4 is already in place for this permit # on building (5)

Building (6) is permit # (T22CM00131) and TC Of O Level 4 is in place as of today and will be called in under the appropriate permit # Mid next week to add to comments.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00130
Permit Description: New Multi-family Development Building 5
Total Completed Inspections - 39
Date Description Inspector Results Comments
10/05/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 10/05/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
10/13/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 10/13/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/20/2022 COT - LCBU - Preslab Passed {Activity date: 10/20/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
12/08/2022 COT - LCBU - Roof Nailing Passed
12/28/2022 COT - LCBU - Exterior Clips/Sheathing Passed
03/17/2023 COT - LCME - Mechanical Intermediate Passed
03/17/2023 COT - LCBU - Building Above Ceiling Passed
03/17/2023 COT - LCEL - Electrical Intermediate Passed
03/17/2023 COT - LCME - Mechanical Above Ceiling Passed
03/17/2023 COT - LCPL - Plumbing Intermediate Passed
03/17/2023 COT - LCPL - Plumbing Above Ceiling Passed
03/17/2023 COT - LCEL - Electrical Above Ceiling Passed
03/17/2023 COT - LCPL - Plumbing Roof Drains Passed
04/06/2023 COT - HCBU - Interior Shear Bracing Passed
07/11/2023 COT - FCON - Underground Pressure Passed
09/22/2023 BULD - Electrical Clearance Passed Electrical panel, meter boxes, and sub panels are complete for Units 5101, 5102, 5103, 5104, 5201, 5202, 5203, 5204, 5301, 5302, 5303, 5304 & house panel. Okay to energize main electrical panel and meter boxes.
12/12/2023 COT - LCEL - Electrical Progress Passed
12/12/2023 COT - LCBU - Framing Passed
12/12/2023 COT - LCPL - Plumbing Progress Passed
12/12/2023 COT - LCME - Mechanical Progress Passed
12/12/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
12/12/2023 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
12/12/2023 COT - HCPL - Plumbing Progress Passed
12/12/2023 COT - LCEL - Outdoor Lighting Passed
12/12/2023 COT - LCPL - Rough Soil Passed
12/12/2023 COT - LCBU - Building Progress Passed
12/12/2023 COT - LCPL - Yard Water Line Passed
12/12/2023 COT - LCPL - Sewer Passed
12/12/2023 COT - LCPL - Backwater Valve Passed
12/15/2023 COT - LCME - Mechanical Final Passed
12/15/2023 COT - LCEL - Electrical Final Passed
12/21/2023 COT - FCON - Underground Flush Passed
12/21/2023 COT - FCON - Alarm - Final Passed
12/21/2023 COT - FCON - Sprinkler - Final Passed
12/21/2023 COT - FCON - Fire - Final Passed
12/21/2023 FCON – OH Piping & Hydro Passed
12/21/2023 COT - LCPL - Plumbing Final Passed
01/31/2024 COT - LCBU - Building Final Passed 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
12/21/23 recommend level 2 TCO
1/4/24: recommend Level 4 TCO
1/31/24: Passed ok for CofO
01/31/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
10351 NEWPORT AT THE RODEO SPECIAL INSPECTION FINAL PACKET-2024-01-28_V1.PDF DOCUMENTS VIEW
NEWPORT AT THE RODEO - BUILDING 5 REPORT (REV)_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
10351_NAR_WATER_TESTING_REPORT_FOR_BLDGS_567-2023-12-22_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
ZONING DECISION LETTER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW