Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM09935
Permit Details
Apply Date:
12/29/2021
Applicant:
Cindy Nemo
Description:
SFR T91319 T19-M0025
Conditions
Permit Number - T21CM09935
Permit Status: Issued
Permit Description: SFR T91319 T19-M0025
Date | Description | Comments |
---|---|---|
12/29/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T21CM09935
Permite Description: SFR T91319 T19-M0025
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T21CM09935
Permit Description: SFR T91319 T19-M0025
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/15/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/11/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Alex Cancel all other inspections} |
|
02/15/2022 | COT - RSPL - Sewer | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/11/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Alex Cancel all other inspections} |
|
02/15/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/11/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA per Alex Cancel all other inspections} |
|
02/25/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/25/2022 | COT - RSBU - Preslab | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/25/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
02/25/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
03/10/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 03/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
03/31/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 03/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/30/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CA no plans on site} ; {Activity date: 03/17/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE The garage walk door trimmers have not been replaced and the blocking in the garage wall is not nailed off and flush with the framing. This is my 3rd inspection. PAY A REFEE BEFORE ANYMORE INSPECTIONS.} ; {Activity date: 03/14/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO Corrections incomplete 1. Missing 3 king studs next to 4x6 post at patio door. 2. Nail off blocking in garage wall 3. Trimmer studs are required to be continuous, without splices or blocks } ; {Activity date: 03/10/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO Missing king studs, garage blocking not nailed, missing HD anchors, incorrect header in garage walk door.} |
|
10/05/2022 | COT - LCBU - Framing | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Missing cripple stud at stairway. Missing anchor bolts. Re nail loose studs.} | |
10/05/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - CODE ECO} | |
10/05/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved. Clearance for TEP ECO} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Ground needs to be tightened and secured.} | |
10/05/2022 | RSME - Mechanical Progress | Passed | {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Provide 10’ minimum clearance fresh air intake from vent lines.} | |
10/18/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/14/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. DWV PASSED. Pex is to close to the can lighting. Re-inspection fee applies. $165.00} ; {Activity date: 10/13/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Canceled per contractor.} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Provide DWV test.} ; {Activity date: 10/11/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA per Sean} ; {Activity date: 10/07/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by RSALDAT1 - Not ready. Per previous notes. Stacks are empty.} ; {Activity date: 10/05/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready plumbing line in downstairs bathroom has a leak. Fitting needs to be glued.} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready. Missing nail plates on vent lines. Provide DWV test through second floor. Provide fire foam at all top penetrations. At stud shoes to over notching studs.} |
|
12/14/2022 | COT - BULD - SWG Clearance | Passed | clearance for Southwest Gas. | |
12/27/2022 | COT - RSEL - Electrical Final | Passed | ||
12/27/2022 | COT - RSME - Mechanical Final | Passed | ||
12/27/2022 | COT - RSEL - Outdoor Lighting | Passed | ||
12/27/2022 | RSPL - Plumbing Progress | Passed | ||
12/27/2022 | RSBU - Building Final | Passed | ||
12/27/2022 | COT - RSPL - Plumbing Final | Passed |