Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
4700 S LANDING WY
Apply Date:
12/27/2021
Applicant:
Description:
New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas

Permit Reviews

Permit Number - T21CM09873
Permit Status: Complete
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Start Date Submittal Complete Date Status  
03/01/2022 RESUBMITTAL 04/07/2022 COMPLETED Review Details
04/07/2022 RESUBMITTAL 04/21/2022 COMPLETED Review Details
05/25/2022 REVISION - - 1ST 07/21/2022 COMPLETED Review Details
08/04/2022 REVISION - - 2ND 09/22/2022 COMPLETED Review Details
12/27/2021 3RD PARTY REVIEW - COMMERCIAL 02/28/2022 COMPLETED Review Details
02/08/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/08/2023 APPROVED Review Details
02/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM09873
Permit Status: Complete
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Date Description Comments
02/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/25/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
02/25/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/25/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/25/2022 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL.
02/25/2022 SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS.
02/25/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM.
02/25/2022 SHOP DRAWINGS REQUIRED FOR KITCHEN HOOD SUPPRESSION SYSTEM.
02/25/2022 SHOP DRAWINGS REQUIRED FOR SIGNAGE.
02/25/2022 SHOP DRAWINGS REQUIRED FOR OPEN-WEB STEEL ROOF JOISTS AND ROOF GIRDERS.
02/25/2022 SHOP DRAWINGS REQUIRED FOR COLD-FORMED-METAL STUD FRAMING.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09873
Permite Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
11/04/2022 COT - LCPL - Rough Soil N/A Partial Pass Partial approval 1500 gal grease interceptor and lines from building to 6”main, okay to backfill progress areas
10/26/2022 COT - LCPL - Plumbing Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
01/26/2023 COT - HCME - Mechanical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09873
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Total Completed Inspections - 33
Date Description Inspector Results Comments
07/06/2022 COT - LCBU - Preslab Passed {Activity date: 07/06/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/10/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 10/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/07/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Partial. North side and south side bump out sheathings of building are done. Still waiting on East and West side bump out sheathing center of building to be installed.

} ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for clips and framing, okay to sheath}
11/07/2022 COT - LCPL - Rough Soil Passed
11/07/2022 COT - HCPL - Yard Water Line Passed
11/16/2022 COT - LCPL - Gas Pressure Test Passed
11/16/2022 COT - LCPL - Plumbing Above Ceiling Passed
12/05/2022 BULD - Electrical Clearance Passed ECO
12/05/2022 COT - LCEL - Construction Power Passed
01/04/2023 COT - BULD - SWG Clearance Passed
01/04/2023 COT - HCPL - Gas Final Passed For SW Gas meter
01/09/2023 COT - LCBU - Building Above Ceiling Passed
01/10/2023 COT - LCEL - Electrical Underground Passed
01/10/2023 COT - LCPL - Plumbing Intermediate Passed
01/10/2023 COT - LCPL - Sewer Passed
01/10/2023 COT - LCME - Mechanical Intermediate Passed
01/10/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
01/13/2023 COT - HCBU - Masonry Pregrout Passed
01/13/2023 COT - LCBU - Roof Nailing Passed
01/17/2023 COT - LCEL - Grounding/Bonding Passed
01/17/2023 COT - LCBU - Sustainability Passed
01/17/2023 COT - LCEL - Outdoor Lighting Passed
01/19/2023 COT - LCEL - Electrical Final Passed
01/20/2023 COT - LCME - Mechanical Final Passed
01/24/2023 COT - FCON - Underground Flush Passed
01/24/2023 COT - FCON - Sprinkler - Final Passed
01/24/2023 COT - FCON - Underground Pressure Passed
01/24/2023 COT - LCPL - Plumbing Final Passed
01/24/2023 COT - FCON - Alarm - Final Passed
01/24/2023 COT - FCON - Hood System - Final Passed
01/24/2023 COT - LCME - Kitchen Hood Passed
01/24/2023 FCON – OH Piping & Hydro Passed
01/24/2023 COT - FCON - Fire - Final Passed
01/26/2023 COT - LCBU - Building Final Passed recommend for C/O