Permit Reviews
Permit Number - T21CM09873
Permit Status: Complete
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2022 | RESUBMITTAL | 04/07/2022 | COMPLETED |
| 04/07/2022 | RESUBMITTAL | 04/21/2022 | COMPLETED |
| 05/25/2022 | REVISION - - 1ST | 07/21/2022 | COMPLETED |
| 08/04/2022 | REVISION - - 2ND | 09/22/2022 | COMPLETED |
| 12/27/2021 | 3RD PARTY REVIEW - COMMERCIAL | 02/28/2022 | COMPLETED |
| 02/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/08/2023 | APPROVED |
| 02/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM09873
Permit Status: Complete
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
| Date | Description | Comments |
|---|---|---|
| 02/25/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 02/25/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 02/25/2022 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 02/25/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 02/25/2022 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 02/25/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/25/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/25/2022 | SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR AUTOMATIC FIRE SPRINKLERS. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR KITCHEN HOOD SUPPRESSION SYSTEM. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR SIGNAGE. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR OPEN-WEB STEEL ROOF JOISTS AND ROOF GIRDERS. | |
| 02/25/2022 | SHOP DRAWINGS REQUIRED FOR COLD-FORMED-METAL STUD FRAMING. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM09873
Permite Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 10/27/2022 | COT - LCBU - Framing | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Masonry Pregrout | N/A | Not Ready | |
| 10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 11/04/2022 | COT - LCPL - Rough Soil | N/A | Partial Pass | Partial approval 1500 gal grease interceptor and lines from building to 6”main, okay to backfill progress areas |
| 10/26/2022 | COT - LCPL - Plumbing Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Outdoor Lighting | N/A | Not Ready | |
| 01/26/2023 | COT - HCME - Mechanical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09873
Permit Description: New Family Entertainment Center with full dining, bowling, laser tag, arcade games, party areas
Total Completed Inspections - 33
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2022 | COT - LCBU - Preslab | Passed | {Activity date: 07/06/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} | |
| 10/10/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/07/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Partial. North side and south side bump out sheathings of building are done. Still waiting on East and West side bump out sheathing center of building to be installed. } ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for clips and framing, okay to sheath} |
|
| 11/07/2022 | COT - LCPL - Rough Soil | Passed | ||
| 11/07/2022 | COT - HCPL - Yard Water Line | Passed | ||
| 11/16/2022 | COT - LCPL - Gas Pressure Test | Passed | ||
| 11/16/2022 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 12/05/2022 | BULD - Electrical Clearance | Passed | ECO | |
| 12/05/2022 | COT - LCEL - Construction Power | Passed | ||
| 01/04/2023 | COT - BULD - SWG Clearance | Passed | ||
| 01/04/2023 | COT - HCPL - Gas Final | Passed | For SW Gas meter | |
| 01/09/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 01/10/2023 | COT - LCEL - Electrical Underground | Passed | ||
| 01/10/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/10/2023 | COT - LCPL - Sewer | Passed | ||
| 01/10/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
| 01/10/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 01/13/2023 | COT - HCBU - Masonry Pregrout | Passed | ||
| 01/13/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 01/17/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
| 01/17/2023 | COT - LCBU - Sustainability | Passed | ||
| 01/17/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 01/19/2023 | COT - LCEL - Electrical Final | Passed | ||
| 01/20/2023 | COT - LCME - Mechanical Final | Passed | ||
| 01/24/2023 | COT - FCON - Underground Flush | Passed | ||
| 01/24/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 01/24/2023 | COT - FCON - Underground Pressure | Passed | ||
| 01/24/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 01/24/2023 | COT - FCON - Alarm - Final | Passed | ||
| 01/24/2023 | COT - FCON - Hood System - Final | Passed | ||
| 01/24/2023 | COT - LCME - Kitchen Hood | Passed | ||
| 01/24/2023 | FCON – OH Piping & Hydro | Passed | ||
| 01/24/2023 | COT - FCON - Fire - Final | Passed | ||
| 01/26/2023 | COT - LCBU - Building Final | Passed | recommend for C/O |