Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3456 S KINO PW
Address NEW:
3456 S KINO PW
Apply Date:
10/12/2021
Applicant:
Jay Jones
Description:
New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc

Permit Reviews

Permit Number - T21CM08080
Permit Status: Complete
Permit Description: New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc
Start Date Submittal Complete Date Status  
05/10/2022 RESUBMITTAL 05/31/2022 COMPLETED Review Details
06/22/2022 RESUBMITTAL 06/28/2022 COMPLETED Review Details
07/05/2022 RESUBMITTAL 07/05/2022 COMPLETED Review Details
08/26/2022 REVISION - - 1ST 08/26/2022 ACTIVE Review Details
10/12/2021 3RD PARTY REVIEW - COMMERCIAL 04/12/2022 COMPLETED Review Details
03/07/2023 COMMERCIAL REVIEW - FULL v.2 03/16/2023 APPROVED Review Details
10/27/2022 COMMERCIAL REVIEW - FULL v.1 01/03/2023 REQUIRES RESUBMIT Review Details
05/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/26/2023 APPROVED Review Details

Conditions

Permit Number - T21CM08080
Permit Status: Complete
Permit Description: New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc
Date Description Comments
04/11/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/11/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/11/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2022 SPECIAL INSPECTION IS REQUIRED FOR EARTHWORK.
04/11/2022 SHOP DRAWINGS REQUIRED FOR PREFABRICATED WOOD I-JOISTS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM08080
Permite Description: New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
02/16/2023 COT - LCEL - Construction Power N/A Not Applicable
02/16/2023 COT - LCBU - Stem Wall/Retaining Wall N/A Not Applicable
02/16/2023 COT - LCBU - Sustainability N/A Not Applicable
02/16/2023 COT - LCPL - Medical Gas Preconstruction Mtg N/A Not Applicable
02/16/2023 COT - LCBU - Masonry Pregrout N/A Not Applicable
02/16/2023 COT - BULD - SWG Clearance N/A Not Applicable
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM08080
Permit Description: New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc
Total Completed Inspections - 28
Date Description Inspector Results Comments
08/25/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 08/25/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/12/2022 COT - LCEL - Electrical Underground Passed {Activity date: 10/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for underground secondary from transformer to switchgear for Bldg 8, okay to backfill progress areas} ; {Activity date: 08/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
11/14/2022 COT - LCBU - Framing Passed
11/14/2022 COT - LCBU - Exterior Clips/Sheathing Passed
11/14/2022 COT - LCBU - Roof Nailing Passed
11/18/2022 COT - LCPL - Plumbing Roof Drains Passed
01/25/2023 COT - LCPL - Plumbing Above Ceiling Passed shell only
02/16/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
02/16/2023 FCON – OH Piping & Hydro Passed
02/16/2023 COT - HCBU - Interior Shear Bracing Passed shell only
02/16/2023 COT - LCBU - Building Progress Passed
02/16/2023 COT - LCEL - Electrical Above Ceiling Passed
04/27/2023 COT - FCON - Sprinkler - Final Passed
02/16/2023 COT - LCBU - Building Above Ceiling Passed
02/16/2023 COT - HCBU - Exterior Clips/Sheathing Passed
02/16/2023 COT - LCPL - Plumbing Intermediate Passed shell only
02/16/2023 COT - LCPL - Plumbing Final Passed
02/16/2023 COT - LCEL - Electrical Intermediate Passed
02/16/2023 COT - LCPL - Sewer Passed
03/02/2023 COT - LCPL - Rough Soil Passed shell only
04/12/2023 COT - LCEL - Electrical Final Passed
04/12/2023 COT - LCEL - Outdoor Lighting Passed
04/12/2023 COT - LCBU - Preslab Passed
04/12/2023 BULD - Electrical Clearance Passed
04/12/2023 COT - LCBU - Building Final Passed
04/27/2023 SITE - Zoning Final Passed
04/28/2023 COT - FCON - Alarm - Final Passed monitoring company did not have any information of this system.
04/28/2023 COT - FCON - Fire - Final Passed