Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM07845
Permit Details
Apply Date:
10/01/2021
Applicant:
Trinidad Valencia
Description:
Interior Remodel of Existing Building
Permit Reviews
Permit Number - T21CM07845
Permit Status: Complete
Permit Description: Interior Remodel of Existing Building
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/01/2021 | COMMERCIAL - TI | 11/09/2021 | COMPLETED |
11/10/2021 | RESUBMITTAL | 11/15/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM07845
Permite Description: Interior Remodel of Existing Building
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/23/2023 | COT - LCME - Mechanical Intermediate | N/A | Not Applicable | N/A |
03/23/2023 | COT - LCBU - Building Above Ceiling | N/A | Not Applicable | N/A |
03/23/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | N/A |
03/23/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
03/23/2023 | COT - LCBU - Framing | N/A | Partial Pass | 3-23-23: All except Plumbing wall. |
03/23/2023 | COT - LCPL - Yard Water Line | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
11/27/2023 | COT - LCBU - Building Progress | N/A | Re-inspection required | 9/11/23: Partial pass--plumbing is not complete for salon sinks, toilet is 15" from wall and needs to be 18" centered, and bathroom sink is not completely connected to water or sewer lines. Electrical and mechanical are completed and operational. 11/27/23: knee guards on sink drain missing, grab bars exceed 36" height max, vertical grab bar missing, bathroom signage missing, |
11/27/2023 | COT - LCBU - CofO | N/A | Re-inspection required | 9/11/23: Partial pass--plumbing is not complete for salon sinks, toilet is 15" from wall and needs to be 18" centered, and bathroom sink is not completely connected to water or sewer lines. Electrical and mechanical are completed and operational. 11/27/23: knee guards on sink drain missing, grab bars exceed 36" height max, vertical grab bar missing, bathroom signage missing, |
11/27/2023 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 9/11/23: Partial pass--plumbing is not complete for salon sinks, toilet is 15" from wall and needs to be 18" centered, and bathroom sink is not completely connected to water or sewer lines. Electrical and mechanical are completed and operational. 11/27/23: knee guards on sink drain missing, grab bars exceed 36" height max, vertical grab bar missing, bathroom signage missing, |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM07845
Permit Description: Interior Remodel of Existing Building
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 03/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover progress areas.} ; {Activity date: 02/22/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Inspection canceled by contractor } |
|
03/23/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
04/14/2023 | COT - LCPL - Plumbing Intermediate | Passed | Approved. Corrections were made. 4/14/2023 | |
04/14/2023 | COT - LCBU - Framing | Passed | Approved. 4/14/2023 | |
09/11/2023 | COT - LCPL - Yard Water Line | Passed | Porch lights are installed and operational. | |
09/11/2023 | COT - LCME - Mechanical Final | Passed | Mini-Split units are installed and operational. | |
09/11/2023 | COT - LCEL - Grounding/Bonding | Passed | Electrical service and sub panel are properly grounded with an 8' ground rod. | |
09/11/2023 | COT - LCEL - Service Upgrade | Passed | Electrical service upgrade and sub panel in building are properly grounded with an 8' ground rod. | |
09/11/2023 | COT - FCON - Fire - Final | Passed | ||
09/11/2023 | COT - LCEL - Electrical Final | Passed | Electrical panel is properly labeled and electricity is operating. | |
09/11/2023 | COT - LCEL - Outdoor Lighting | Passed | Porch lights are installed and operational. | |
12/18/2023 | COT - LCBU - Building Progress | Passed | ||
12/18/2023 | COT - LCBU - Building Final | Passed | ||
12/18/2023 | COT - LCBU - CofO | Passed | ||
12/18/2023 | COT - LCPL - Plumbing Final | Passed |